- Engine and heads cleaned
- Surfaces renewed by milling
- Blocks bored and honed
- Connecting Rods reconditioned
- New pin bushings installed
- Crank shaft ground and polished
- Cylinder heads Presure tested
- Cam lines check
- Heads Checked for thickness
- Heads rebuilt with three angle valve grind