Carburetor Choke Thermostat Carter 4bbl Dodge 1970 # 3462927 on 2040-parts.com
Duluth, Minnesota, United States
Chokes for Sale
- Nos gm 67-69 pontiac firebird tempest ohc 230-250 oil filler tube baffle screen(US $50.00)
- Choke pull off for ford & mercury 1975 - 1977, 1979 - 1982 / 6 and 8 cylinder(US $23.95)
- Carquest-standard cpa275 carburetor choke pull off fits gm from 1981 to 1983(US $9.75)
- Edelbrock electric choke kit 1478(US $66.25)
- Nos 67 68 69 70 camaro z28 302 327 350 427 holley 4bbl choke thermostat 3972186(US $25.00)
- Carburetor choke thermostat wells e6151 fits 80-82 toyota corolla 1.8l-l4(US $53.99)
Koenigsegg Agera S Hundra: Geneva Motor Show
Tue, 05 Mar 2013The 100th car of Koenigsegg’s history has been revealed at the Geneva Motor Show – the Koenigsegg Hundra – a one-off Agera S. Now the Koenigsegg Hundra (Hundra means 100th in Swedish) has been unveiled on the floor at Geneva, representing 4000 man hours of effort by Koenigsegg to make their 100th car special. Costing the deep-pocketed Hong Kong customer a hefty $1.6 million (half the price of the Lamborghini Veneno) the Hundra is based on the Agera S – 1016bhp and 811lb/ft of torque, 1400kg, 0-62mph in 2.8 seconds – and sports a naked carbon fibre body with gold leaf highlights.
Car Design of the Year winners awarded at Car Design Night Geneva 2013
Mon, 11 Mar 2013The winners of the 2012 Car Design of the Year Awards, as voted for by Car Design News readers, were announced at the annual Car Design Night at By Pass nightclub on the evening of the first Geneva motor show press day. Over 350 car designers were in attendance to catch up with their colleagues and meet new peers at the first European show of the year. Car Design News' editor, Owen Ready, presented the winners of the annual Car Design of the Year Awards.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.