Caterpillar V-belt Part# 9y-1131 New In Package on 2040-parts.com
Brewerton, New York, United States
UP FOR AUCTION IS THIS NEW IN THE PACKAGE CATERPILLAR V-BELT PART # 9Y-1131 AS SHOWN.
|
Belts & Pulleys for Sale
- Caterpillar v-belt part# 9m-1091 new in package(US $15.90)
- Caterpillar v-belt part# 7e-0744 new in package(US $10.90)
- Gm 250 inline 6 cylinder intake(US $55.00)
- Dorman 594-429 engn harmoc blncr fit acu mdx 10-13 l6 3.7l 3664 rdx l6 3.5l 3471(US $61.30)
- Dorman 594-427 engine harmonic balancer fit ram trucks 10-10 l8 5.7l 5655cc(US $121.55)
- Dorman 300-313-mx power steering pump pulley fit dodge dakota 03-03 l8 4.7l -cc(US $12.14)
BMW i8 Concept (2011) first official pictures
Fri, 29 Jul 2011This is the BMW i8 Concept, a near-production preview of Munich’s new plug-in hybrid supercar. Audi and Mercedes might have stolen a march on BMW with the R8 and SLS respectively, but while its rivals prepare limited-run electric versions of their supercars, BMW is putting this i8 into proper mass production in just two years time. The BMW i8, and its i3 EV sibling, will be revealed at the 2011 Frankfurt motor show in September. So this BMW i8 supercar is a plug-in hybrid?
Top Gear tonight: Merc 190E, BMW M3 & Sierra Cosworth for under £5k
Sun, 04 Jul 2010Top Gear Super Saloons for under £5k Here we are at week two of the latest series of Top Gear already, so as ever a reminder that the boys are on the box at 8pm (BST) tonight on BBC2 and – to speak in TG – the footballists aren’t on tonight so you don’t need to Sky+ one or other. What’s on offer this week? It’s super saloons for under £5k this week with Messrs Clarkson, Hammond & May going out and grabbing some high-preformance saloons for under £5k to see if they can ferry the brood and offer high speed thrills to boot.
KISKA opens new design studio
Thu, 19 Mar 2009Austrian brand management and design company KISKA has moved its design studio into a modern new building in Salzburg, Austria, just a few meters from its former location. The new headquarters boasts state-of-the-art workstations and has been built to enable the firm to prepare for expansion and new challenges in the years to come. Designed by Hofbauer architects, the 4700m² building was built in just one and a half years.