Cci 03074u10 - 93-94 Ford Ranger 14" Factory Original Style Wheel Rim 5x114.3 on 2040-parts.com
Tampa, Florida, US
Other for Sale
- Cci 03301u20 - 99-02 mercury cougar 15" factory original style wheel rim 4x108(US $154.53)
- Cci 03136u10 - 1996 ford bronco 15" factory original style wheel rim 5x139.7(US $155.92)
- Cci 07065u20 - 2009 saturn sky 18" factory original style wheel rim 5x112(US $188.64)
- Cci 63802u10 - 98-99 honda accord 15" factory original style wheel rim 4x114.3(US $167.07)
- Cci 05241u10 - cadillac escalade 20" factory original style wheel rim 6x139.7(US $271.43)
- Cci 05116u10 - 01-04 chevy s-10 16" factory original style wheel rim 5x120.65(US $160.39)
Driven: Hyundai i40
Tue, 16 Aug 2011CDN recently spent a day sampling Hyundai’s new i40 Tourer, which has just been launched in Europe. For the launch, Hyundai invited us to Waddesdon Manor, the home of the Rothschild banking family and a venue that has been used for previous Louis Vuitton events. It has recently added a new art gallery with fabulous views across rolling countryside, and contains work by Anish Kapoor, Michael Craig-Martin and bronzes by Angus Fairhurst.
Ford Kuga: New engines & Ford Kuga ‘Individual’
Thu, 08 Jul 2010The Ford Kuga gets a new diesel lump in two flavours for 2010/2011 It shouldn’t come as a much of a shock that Ford are sticking new diesel engines in the Ford Kuga. We reported back in February that the Kuga was due an engine transplant with the Mondeo also in line for some new oily bits. Ford sent us details of the new Mondeo engines for 2011 last month, and now its the turn of the Kuga.
Webinars: Listen again to Autodesk 'Automotive visualization, new quality standards in Virtual Prototyping'
Thu, 28 Mar 2013Autodesk presented its latest Webinar, 'Automotive visualization, new quality standards in Virtual Prototyping', on 11 April. Virtual Prototyping is one of the most important steps in the development of a new car allowing the evaluation of a prototype in different aspects before it's even built. Autodesk's new VRED product line can be used throughout the whole design and construction process on a single data basis, without the need to re-do work.