Chevy C10 Gmc Truck Body Mounts / Brackets on 2040-parts.com
Cartersville, Georgia, United States
CHEVY C10 TRUCK BODY MOUNTS / BRACKETS..NOT SURE WHICH TRUCK THESE WERE REMOVED FROM.
Please do your own research to be sure that this is the part(s) you require. If you have any questions, please ask. PLEASE ENLARGE OR ZOOM PICTURES. Thank you for looking and please check out my other listings.. 60,61,62,63,64,65,66,67,68,69,70,71,72 |
Other Parts for Sale
- 65-72 corvette wittek camaro clamp 427 l88 454 ls5 ls6 original gm dated 2/71(US $75.00)
- 2 rear shock absorbers 1971-1976 cadillac calais deville & fleetwood new pair
- 1977 1978 77 78 chevrolet van nos gm sunvisor gmc(US $24.99)
- Chiilton repair manual cadillac 1967-1989
- 1976 1977 76 77 cutlass grand prix nos gm arm rest panel(US $24.99)
- 67-74 mopar a body dart duster demon ribbed electric windshield washer hose set(US $17.85)
Michelin Challenge Design 2007 - 'Sharing the Road'
Tue, 10 Oct 2006It's estimated over 1.2 million people die each year in traffic mishaps around the world. That's 3200 per day, 7 days a week, 365 days a year, year after year. With such statistics in mind, 'Sharing the Road' was designated as the theme for the 2007 Michelin Challenge Design competition.
College Exhibition: IED Degree Show 2006
Fri, 06 Oct 2006Students of the Transportation Design course at Turin's Istituto Europeo di Design (IED) have been busy designing a new road-going McLaren sports car for the British brand. Third-year students developed 14 super cars for project sponsors McLaren as part of their final-year project for the 2005-2006 academic year. The brief was to come up with a sports car capable of speeds of over 320 km/h (200 mph), that would provide its owner with road-going F1 technology and unparalleled dynamic and aerodynamic performance.
July 9: Keeping it topped off
Fri, 09 Jul 2010As expected, when I walked back to my parking space at VSP parking across the street from Burbank Airport the i-MiEV was fully charged. No problem. It had more than 24 hours to get charged and it can't take more than 16 hours to do it, if you figure one hour per kWh at 120 volts.