Find or Sell any Parts for Your Vehicle in USA

Chrysler 60 Amp Stator. Old Long Lead Style #7006 on 2040-parts.com

US $22.00
Location:

Ypsilanti, Michigan, United States

Ypsilanti, Michigan, United States
Rewound.
Brand:Chrysler

Chrysler 60 amp stator - rewound. These are the old style long lead #7006 stator. Make me an offer I can't refuse. 

About US:

We are a family owned and operated automotive rebuilder in operation for over 50 years! Dad is retired and I'm helping him sell off a lifetime worth of inventory. We specialize in early model starters, generators, alternators, and related electrical system component parts.

Thanks for look'n,

BMW Concept X5 eDrive (2013) plug-in hybrid at Frankfurt motor show

Thu, 22 Aug 2013

Sharing the stage with the BMW i3 at the Frankfurt motor show is the BMW Concept X5 eDrive. The plug-in hybrid X5 is set to re-write the SUV rulebook with its four-cylinder petrol-electric drivetrain producing claimed figures of less than 90g/km of CO2 and a tree-hugging 74.3mpg, smashing the Lexus RX450h which produces 145g/km and 44.8mpg. What’s more, it’s better than the most efficient 3-series currently on sale, and far more frugal than the V8-powered BMW X6 Active Hybrid that was axed in late 2011.

Watch: BMW driver drifts 51 miles to set new world record

Thu, 16 May 2013

Johan Schwartz shattered the Guinness World Record for longest sustained drift in a BMW M5 Saturday, completing a total of 322.5 laps and covering 51.278 miles. Schwartz, a BMW Performance Driving instructor, beat the previous 6.94-mile drift record at the BMW Performance Center in Greenville, S.C. using just one set of Continental tires.

Video: Chevrolet engineer Oppenheiser talks 2012 Camaro ZL1

Tue, 02 Aug 2011

What we have here is a little teaser video of the 2012 Chevrolet Camaro ZL1 featuring chief engineer Al Oppenheiser. It was filmed at the Camaro Homecoming Event in Oshawa, Ontario, Canada, in June. Oppenheiser gives us a look at the 6.2-liter supercharged Camaro, explaining how airflow will enter the front grille and be drawn away from the engine with the hood vents.