Clear Park Parking Lamp Lens Right Fits 81-88 Oldsmobile Cutlass Supreme on 2040-parts.com
Corner Lights for Sale
- Clear park parking lamp lens left fits 81-88 oldsmobile cutlass supreme salon(US $45.99)
- Indicators set for toyota hilux 4wd 1983-1988(AU $119.20)
- Indicator light for mazda 121 metro right 2000-2002(AU $202.00)
- Smoke for mercedes w202 c 93-00 front indicator light lamp turn signal l+r set(US $65.85)
- Dorman 1630856 park lamp assembly(US $69.33)
- 2019-2021 oem for ram 1500 led front right fog light & bracket 68384318aa mopar(US $120.00)
Toyota Etios (2010): news and photos
Tue, 05 Jan 2010Toyota unveiled the Etios hatchback and saloon concepts today at the 2010 New Delhi auto show. It’s Toyota’s New Compact Car for the growing Indian car market. The Etios is aimed at family users, and is consequently a notch above the Tata Nano – in size and anticipated prices.
Peugeot i0n electric car at 2009 Frankfurt motor show
Tue, 08 Sep 2009By Tim Pollard First Official Pictures 08 September 2009 12:57 PSA is forging closer links with Mitsubishi; after the Outlander became the C-Crosser and 4007, now Peugeot has teamed up with the Japanese to launch the i0n – an electric car based on the electric Mitsubishi i-car. The zero-emissions Peugeot i0n (combines a zero with ions, geddit?) will go on sale at the end of 2010 and builds on the French company’s expertise with EVs stretching all the way back to 1995 when it launched the 106 Electric. It’ll go 80 miles on one charge of the lithium ion battery, making it ideal for urban commuting and short shuttles, says Peugeot.
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.