Find or Sell any Parts for Your Vehicle in USA

Clearance Light Bulb-cab Light Front Anzo 861083 on 2040-parts.com

US $48.31
Location:

Front Royal, Virginia, United States

Front Royal, Virginia, United States
Condition:New Quantity Sold:sold individually Harmonized Tariff Code (Schedule B):8512204000 SKU:A1R:861083 Country of Origin (Primary):CN Brand:Anzo Remanufactured Part:N Manufacturer Part Number:861083 Life Cycle Status Description:Available to Order Emission Code:1 UPC:846959039872 Life Cycle Status Code:2 Placement on Vehicle:Front NAFTA Preference Criterion Code:B Quantity Needed:1; Engineering Name:Cab Roof Light Assembly

Legendary designer Chip Foose teams up with Oakley for hot-rod shoes

Mon, 06 Sep 2010

Chip Foose has designed hot rods, concept and production cars for the Detroit Three and has a room full of America's Most Beautiful Roadster and Ridler awards--the pinnacle for a hot-rodder. He's even designed a casino, the Motor City Casino in Detroit. And now, he has penned a shoe.

Concept Car of the Week: Mercedes F200 Imagination (1996)

Fri, 08 Aug 2014

The F200 Imagination was designed at Mercedes' Advanced Design studio in Tokyo, in response to the question 'does the car of the future still have a steering wheel and foot-operated controls?' Take a look at the car's interior and the answer was fairly emphatic, as the steering wheel and pedals were replaced by joysticks, called Sidesticks, that operated the throttle, brakes and steering by wire. There were two sticks to choose from, one on the left of the cabin and one in the center console. However, both had the same function – push forward to accelerate, left or right to turn, and back to brake – so either of the front passengers could control the car.

$5 billion competition on to replace Humvee

Mon, 04 Jun 2012

Competition is heating up to win a contract for a vehicle that will replace nearly 18,500 aging military Humvees for the U.S. Army and Marine Corps starting in 2015. Six proposals are in play, with little time left before federal contracting officials decide on development of the $5 billion-plus program.