Crank Case Breather Pipe Hose Fits Bmw 535d 3.0d 10 To 12 N57d30b Gates Quality on 2040-parts.com
Crankshafts & Parts for Sale
- Cigue xd1al cggb crankshaft at for volkswagen polo 1.4 fsi (86 cv) 1994253-(US $)
- Mercedes (1984-2004) crankshaft cover rear uro parts + 1 year warranty(US $36.95)
- Bmw 335d x5 (2009-2013) crankshaft sensor facet +1 year warranty(US $40.95)
- Bmw (1993-2003) crankshaft pulley hub (vibration damper hub) genuine + warranty(US $78.90)
- Crankshaft 2.4l a/t 2011 acura tsx 900-8-2-2(US $149.00)
- 2015 audi a3 (8v) 2.0l turbo cntc engine crankshaft crank shaft 06l105101d(US $699.99)
Mercedes-Benz OKs the CLS wagon
Wed, 06 Jan 2010Mercedes-Benz will launch a wagon version of the second-generation CLS sedan as a rival to the recently introduced BMW 5-series GT and the upcoming Audi A7. The new four-door--presaged by the German carmaker's 2008 Concept Fascination two-door shooting brake revealed at that year's Paris motor show--is among a throng of niche-market models under consideration by Mercedes boss Dieter Zetsche. "We're seeking to improve our returns by better utilization of existing platforms," a high-ranking Mercedes source told AutoWeek.
Kia GT and Provo look to be heading in to production
Tue, 12 Mar 2013The recent Kia Provo Concept and the impressive Kia GT look like they’re heading in to production as Kia move upmarket. Equally, the stunning Kia GT concept we saw at 2 years ago at Frankfurt - a swoopy coupe Kia take on the Mercedes CLS – was equally convincing, although we’d begun to think Kia had gone cold on the idea of putting the Kia GT in to production. But Auto Express are reporting that both the Provo (with a change of name ) and the GT are close to being signed off for production after a conversation with Benny Oeyen, Kia’s marketing boss in Europe.
Cross-country in a Corvette Stingray: Day Three
Mon, 26 Aug 2013Day two of our cross-country Corvette trek ended in North Platte, Neb., where we encountered a couple of C2 Sting Rays in the parking lot of our Holiday Inn. We shot some photos and hit the sack around 1 a.m. Day three would be the second-longest of the trip at around 14 hours.