Find or Sell any Parts for Your Vehicle in USA

Dea A4045 Mount on 2040-parts.com

US $68.25
Location:

Los Angeles, California, United States

Los Angeles, California, United States
Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Number in Pack:1 EPID:202977458 UPC:139861292856 Brand:DEA/TTPA Manufacturer Part Number:A4045

BMW M5 30th Anniversary Edition (2014) first official pictures

Wed, 07 May 2014

By Ben Pulman First Official Pictures 07 May 2014 15:02 BMW is marking the 30th anniversary of the M5 by building the most powerful ever version of its legendary super-saloon. The BMW M5 ‘30 Jahre M5’ has an extra 39bhp from a tweaked version of its 4.4-litre twin-turbo V8, plus there’s a smattering of special trim and anniversary badging, and just 300 will be built. Apparently ‘this power boost has been achieved through carefully calculated tweaks to the engine management and an increase in charge pressure’.

Jaguar unveils 'F-Type-inspired' driving shoes

Thu, 27 Feb 2014

HAVE YOU been hankering for a pair of shoes to perfectly match your new Jaguar F-Type? If so you’re in luck. British sports and luxury car manufacturer Jaguar has announced the official launch of a new range of footwear, designed and created in collaboration with shoemaker Oliver Sweeney.

Jaguar XF and Range Rover Evoque to be built in India

Tue, 18 Oct 2011

Jaguar XF Range & Rover Evoque to be assembled in India The news that Jaguar Land Rover are planning to assemble the Range Rover Evoque and Jaguar XF in India isn’t exactly a huge surprise. If anything, the surprise is it’s taken this long for them to get round to it. Of course, this isn’t JLR’s first foray in to assembling cars in India, as the Freelander 2 is now being bolted together in Pune now the CKD facility at Halewood is up and running.