Find or Sell any Parts for Your Vehicle in USA

Delphi Fuel Pumps Dfp Fe0066 - Fuel Pump - (electric In-tank Type) - Oem Equi... on 2040-parts.com

US $112.49
Location:

Chino, California, US

Chino, California, US
Returns Accepted:Returns Accepted Item must be returned within:30 Days Return shipping will be paid by:Buyer Refund will be given as:Money Back Restocking Fee:No Alternate:DFP FE0066 Brand:Delphi Fuel Pumps Fuel Pump Gallons Per Hour:24 Fuel Pump Pressure Rating:65 psi Fuel Pump Fitting Type[s]:Bead End - Fuel Line Is A Push-On & Clamped Fuel Pump Strainer Part #:FS0062 Manufacturer:Delphi

Other Parts for Sale

2013 Ford Fusion Energi gets range of 620 miles

Thu, 17 Jan 2013

The hybrid wars continue -- much less exciting than the MyFord Touch -- after the Detroit auto show, and Ford has thrown it latest punch: the 2013 Fusion Energi plug-in hybrid. The Energi is the Blue Oval's fifth electrified vehicle to launch in the past year, and will arrive with a total gas and electric range of 620 miles. That's 120 miles more than the 2014 Honda Accord hybrid and 80 miles more than the Prius hybrid.

Caterham AeroSeven Concept previews new Caterham in 2014

Fri, 20 Sep 2013

The Caterham AeroSeven Concept (pictured) previews a new Caterham in 2014 It’s a new Caterham, but a new Caterham that signals not only a new model for 2014, but a new design direction as Caterham moves towards the fruits of their alliance with Renault on the Alpine project. The Caterham AeroSeven isn’t a look at Caterham’s version of the Renault Alpine project, but a new track-inspired road car designed in a collaboration between Caterham Technology and Innovation, Caterham F1 and Caterham Cars. The new Aero Seven’s underpinnings come from a revised version of the Seven CSR’s chassis with pushrod suspension at the front and full IRS with new dampers and springs.

Toyota to pay $32.4 million U.S. fine over timing of recalls

Tue, 21 Dec 2010

Toyota Motor Corp. agreed on Monday to pay two more safety fines for a total of $32.4 million, the maximum allowable under U.S. law, to settle federal investigations of whether the company notified regulators of safety defects in timely fashion.