Depo Driver & Passenger Side Replacement Outer Tail Light 97-99 98 Nissan Maxima on 2040-parts.com
Ontario, California, US
Tail Lights for Sale
- Depo pair replacement tail light white indicator 01-03 bmw e39 5-series 4dr(US $258.38)
- Depo driver & passenger replacement tail light lamp 03-06 fit kia sorento(US $163.41)
- Smoked 07-10 chevy suburban tahoe gmc yukon denali led tail lights lamps pair(US $142.99)
- 04-08 nissan maxima left tailight (US $65.00)
- 03-05 mazda 6 trunk lid tail lights pair, driver & passenger side mounted oem(US $17.11)
- 2000-2001 infiniti i30 drivers left tail light (US $48.00)
Hyundai Intrado concept (2014) first official pictures
Mon, 24 Feb 2014By Ollie Kew First Official Pictures 24 February 2014 13:01 This is the Hyundai Intrado concept, destined for the 2014 Geneva motor show. It’s a hydrogen-powered crossover penned by Peter Schreyer, the head of Hyundai’s design team, CEO of sister-brand Kia, and with a stint at Audi on his CV to boot. The Intrado is designed to be as lightweight as possible, hinting at what Hyundai sees as the future of family cars.
Melling Hellcat supercar (2007): first official pictures
Thu, 01 Feb 2007By James Mullan First Official Pictures 01 February 2007 09:35 Bat out of hell: the Melling Hellcat Reading this on your computer screen almost certainly means that you’re sitting down. That’s good because you’re not going to believe the figures on Al Melling’s long-awaited Melling Hellcat supercar: a gut-wrenching 1175bhp and at least 275mph, making it potentially the world’s fastest road-legal production car. Yes, you did read that right – one thousand one hundred and seventy-five horses at your personal beck-and-call, capable of propelling this two-seater carbon-fibre-reinforced chariot from 0-60mph in a blink-and-you’ll-miss-it 2.6sec.
GM stops Chevy Volt production to trim inventory
Fri, 02 Mar 2012General Motors will idle the Detroit-area assembly plant that builds the Chevrolet Volt for more than a month to curb rising inventories of the plug-in hybrid. On March 1, GM told 1,300 workers at its Detroit-Hamtramck assembly plant in Michigan that it will shut down production for five weeks, starting the week of March 19. GM plans to resume production on April 23, spokesman Chris Lee said.