Find or Sell any Parts for Your Vehicle in USA

Diesel Engine Block Heater Fit For Dodge Ram 3500 4500 5500 Pickup 6.7l 2014-18 on 2040-parts.com

US $25.13
Location:

China, China

China, China
Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:Unbranded Manufacturer Warranty:6 Months Manufacturer Part Number:68223419AA UPC:957230668862

Block Parts for Sale

Nissan GT-R tweaked for 2009 with more power

Tue, 09 Dec 2008

By Ben Pulman Motor Industry 09 December 2008 11:30 The Nissan GT-R still hasn’t gone on sale in Europe and it's already been treated to a few tweaks - new for 2009 will be more power, revised suspension, different wheels and tyres, plus a price hike. Quite, but the increase is a mere 5bhp, taking the output of Nissan's 3.8-litre twin-turbo V6 from 473 to 478bhp. Nissan says the extra grunt comes from the fine tweaking of the electronics, though torque remains unchanged at 432lb ft.

Bertone's fate to be decided at the end of April

Thu, 27 Mar 2014

Bertone's most recent financial troubles have been far from secret – its no-show at the Geneva motor show confirmed our fears – but until now the company hasn't released an official statement about its situation. However the UK newspaper the Telegraph has gained access to a company spokesperson who confirmed that "the problem is many debts and very high costs. At the moment everything is blocked.

Workers misspell 'bus' on road markings

Tue, 26 Aug 2014

WORKMEN have given road users something to chuckle about by misspelling the word 'bus' during roadworks. "Bup stop" was painted on to the road surface in Bristol in large yellow lettering at the end of last week, with the stencilled letter P used instead of S. The mistake was made as part of road repairs which are likely to last up to four weeks in the Old Market area of the city centre.