Dorman 521-431 Control Arm With Ball Joint on 2040-parts.com
Grand Rapids, Michigan, US
Control Arms & Parts for Sale
- Moog k80706 control arm with ball joint(US $169.40)
- Two (2) dorman control arm steel bushings/ball joint dodge drv/psgr front upper(US $95.89)
- Two (2) dorman control arm steel front lower 4wd dodge 520-367(US $81.89)
- Dorman (oe solutions) 905-203 upper control arm bushing or kit(US $10.97)
- Dorman (oe solutions) 520-740 suspension control arm and ball joint assembly(US $59.92)
- (4) dorman control arm 521-025(US $439.88)
Ford and IDSA to host 'Designing Innovation' live design panel discussion tomorrow
Tue, 06 May 2014Freeman Thomas, strategic design director at Ford, will take part in a live design panel discussion on Wednesday 7 May. The panel, hosted by Ford and the Industrial Designers Society of America, will also include CEO of industrial design firm Fuseproject Yves Béhar, and Christopher Williams, business development director at product design and company Lime Lab. Topics will how technology plays a role in design; how designers shape consumer behaviors and responses to innovative products; and how products both stand out from and fit in with the world around them.
Hot Mitsubishi sports car bound for UK
Fri, 01 Sep 2006By Chris Chilton Motor Industry 01 September 2006 11:06 Mitsubishi is investigating the feasibility of bringing its 350Z-rivalling Eclipse to the UK. Accountants are busy with the calculators right now but sources reckon it’s looking increasingly likely that both the 2+2 coupe and convertible will be in UK showrooms by early next year. A 2.4-litre 162bhp four backed by a five-speed gearbox kicks off the range, supplemented by a 263bhp 3.8-litre V6.
Hiriko folding car: The solution to urban car sharing? [w/video]
Wed, 08 Aug 2012The Hiriko Driving Mobility Group has moved into the manufacturing trial of its two-seater electric microcar, which it hopes will offer a new car-sharing program that will transform the way we travel around our cities. The ‘first-mile' problem – moving between the commuter's home and mass transit hubs – and the ‘last-mile' problem – from mass transit to the workplace – has increased dramatically over the past few decades as more of us live in urban environments. 10 years ago researchers at the Michigan Institute of Technology (M.I.T.) decided to explore alternatives to shuttle buses and other ideas that failed to tackle the problem.