Find or Sell any Parts for Your Vehicle in USA

Dorman 740-125 Window Regulator on 2040-parts.com

US $47.28
Location:

Danbury, Connecticut, US

Danbury, Connecticut, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:30 Days Return shipping will be paid by:Buyer Restocking Fee:No Part Brand:DORMAN Manufacturer Part Number:740-125 SME:_3952 UPC:00019495227038 Feature - Benefit 3:Plug & Play ? No wire splicing necessary Item Quantity Size UOM:Piece Container Type:Box Item Quantity Size:1.0000 Feature - Benefit 1:Engineered improvements enhance performance Interchange Part Number:GENERAL MOTORS OE 21171232 Life Cycle Status Description:Available to Order Maximum Cases per Pallet Layer:3 Life Cycle Status Code:2 Emission Code:1

BMW 1 Series Coupe

Mon, 02 Jul 2007

Details of BMW's latest addition have been officially released. The new 1 Series Coupe - which will be available as both a 128i and a 135i  when it goes on sale in North America - is a modern interpretation of the classic 2002, with a front-engine and rear-drive configuration. As expected, the new car looks a lot like a 1 Series hatch; the biggest difference being the newly created rear end.

Building the brand identity of Brazil's home-grown off-roader

Mon, 18 Aug 2014

Ford's South American design studio in Camaçari, Brazil, has already completed two 'One Ford' global projects, the EcoSport crossover, and the Ka compact. But the replacement for the Troller T4, a basic 4x4 solely for the Brazilian market, has presented a different challenge to the design team led by Joao Marcos Ramos. In 1994, Troller began building tough rally-raid 4x4s for local motor sport events.

Britain to be third global production site for the Nissan Leaf EV after Japan, U.S.

Thu, 18 Mar 2010

Nissan Motor Co. said it will build the new Leaf electric vehicle at Britain's Sunderland assembly plant starting in early 2013, with initial capacity of 50,000 units. The Japanese company and its French alliance partner Renault will invest more than $642.6 million in the project, including the construction of a lithium ion battery plant on the site.