Find or Sell any Parts for Your Vehicle in USA

E1301 02 03 04 05 06 Nissan Altima Sentra Piston Connecting Rod Oem (2.5l) on 2040-parts.com

US $49.99
Location:

Dayton, Tennessee, United States

Dayton, Tennessee, United States
USED BEAD PLASTED POLISHED
Surface Finish:POLISHED Warranty:Yes

All returns are accepted up to 14 days after date of delivery for cash refund. We offer a 30 day guarantee on all parts unless stated otherwise. Original shipping charges and return shipping charges are not refunded. If a part fails in the guarantee period, the part will be exchanged or refunded at our option. All returns have a 35% restocking fee. Customer pays return shipping. You need to have a return authorization by contacting us before you return the item. No return on electrical items. LOOK AT ALL PIC BEFORE YOU BUY. TENNESS RESIDENTS MUST PAY SALES TAX.WE PULLD PARTS FROM A 2003 ALTIMA 2.5L.

Vauxhall Insignia VXR – UK Debut at Goodwood

Tue, 23 Jun 2009

Vauxhall Insignia VXR makes its UK public Debut at the Goodwood Festival of Speed The Vauxhall Insignia VXR was revealed in April as a 325bhp version of the very good Insignia. Featuring adaptive four wheel drive and an electronic limited slip diff., the handling is also aided by a 10mm lower suspension setup than the standard Insignia, and HiPerStrut front suspension which keeps torque steer in check. Vauxhall XVR Concept The Insignia VXR manages the 0-60 sprint in 5.8 seconds and a limited top speed of 155mph.

Some Chevy dealers turn down additional Volt inventory

Mon, 23 Jan 2012

Some Chevrolet dealers are turning down Volt EVs that General Motors wants to ship to them, a potential stumbling block as GM looks to accelerate sales of the plug-in hybrid. For example, consider the New York City market. Last month, GM allocated 104 Volts to 14 dealerships in the area, according to a person familiar with the matter.

Detroit Electric delays SP:01 EV

Mon, 03 Jun 2013

Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.