Find or Sell any Parts for Your Vehicle in USA

Earl's Performance Brake Adapters 997592 on 2040-parts.com

US $5.62
Location:

Florida, New York, United States

Florida, New York, United States
Condition:New Brand:Earl's Performance Plumbing Warranty:No Manufacturer Part Number:997592

Fitting Angle: Straight

Fitting Attachment 1: Banjo bolt

Fitting Size 1: 12mm x 1.5

Fitting Material: Aluminum

Fitting Finish: Blue anodized

Earl's Performance brake adapters are manufactured from both zinc plated steel and anodized aluminum. They meet and exceed the minimum requirements for aerospace fittings and are a perfect addition to your custom brake system. They're precision-machined to exacting tolerances for trouble-free and long-lasting performance.

Jaguar XK 5.0 Prices and Specifications

Tue, 29 Sep 2009

Full Jaguar XK 5.0 - Coupe and Convertible - Specifications and prices below. The standard V8 version with the normally aspirated V8 is a great choice for a Grand Tourer. It offers performance pretty much up with the previous Supercharged XKR, but in a much more refined and civilised way.

BMW i Store in London previews new BMW i3 Concept

Wed, 13 Jun 2012

The first BMW i Store has opened in London’s Park Lane and previews a new version of the BMW i3 Concept fitted with BMW i Pedelec Concept bicycles. Despite BMW appearing to go cool on their Project i, the first BMW i Store has opened in Park Lane, London. Positioned alongside the BMW Park Lane and MINI Park Lane Showrooms, the BMW i Park Lane Showroom has been opened to help car buyers get a better idea of what BMW i cars are all about ahead of the launch of the i3.

BID TO SLOW TRAFFIC ON M3 STRETCH

Fri, 14 Feb 2014

FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.