Echlin Ignition Parts Ech Ns6554 - Back-up Light Switch on 2040-parts.com
Chino, California, US
Other Parts for Sale
- Echlin ignition parts ech ns6688 - neutral safety switch(US $205.20)
- Echlin ignition parts ech ns6682 - back-up light switch(US $23.84)
- Echlin ignition parts ech ns6665 - back-up light switch(US $34.29)
- Echlin ignition parts ech ns6653 - back-up light switch(US $21.64)
- Echlin ignition parts ech ns6633 - back-up light switch(US $24.84)
- Firebird pontiac steering wheel(US $14.95)
Lexus RX (2009) revealed in brochure blunder
Thu, 30 Oct 2008By Chris Clarke First Official Pictures 30 October 2008 15:34 Lexus has let slip pictures of its new RX after a Japanese brochure was seemingly leaked ahead of the car’s launch. We weren’t supposed to see the 4x4 until the November 2008 LA auto show, but we’ve tracked down the photos of the new Lexus RX early. They certainly look it and insiders at Lexus GB suggest they are genuine.
Ford S-MAX Vignale Concept revealed
Tue, 08 Apr 2014The Ford S-Max Vignale (pictured) arrives to top the S-Max range The arrival of the Ford Mondeo Vignale Concept last year made it clear Ford were ready to do a 21st century version of the ‘Ghia’ badge engineering to create a range-topping sub-brand with the Vignale badge with all the whistles and bells on it. Today’s arrival of the Ford S-MAX Vignale Concept reinforces that conclusion. Just like the Mondeo Vignale, the S-Max Vignale comes with plenty of upmarket materials and toys, like 21″ alloys, chrome mirror caps, Vignale Grill, embossed leather with quilting, tablet docking and a Milano Grigio paint job.
BID TO SLOW TRAFFIC ON M3 STRETCH
Fri, 14 Feb 2014FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.