Find or Sell any Parts for Your Vehicle in USA

Eis D1901 Wheel Lug Stud Bolt on 2040-parts.com

US $6.90
Location:

Pinehurst, Texas, US

Pinehurst, Texas, US
Refund will be given as:Money Back Return shipping will be paid by:Buyer Restocking Fee:No Return policy details: Returns Accepted:Returns Accepted Item must be returned within:30 Days Brand:EIS Interchange Part Number:D1901

2012 Nissan 370Z Facelift – if you look really closely

Tue, 07 Feb 2012

The 2012 Nissan 370Z gets a mild tweak - debuts at the Chicago Motor Show The Nissan 370Z is getting a facelift for 2012 – which will debut this week at the Chicago Motor Show – but it’s not extensive. All the car buzz at the moment – at least around new models – is about the Geneva Motor Show in March. Which might explain why the 2012 Nizzan 370Z facelift is getting paraded on a much quieter stage at the Chicago Motor Show. Because we’re struggling to see what exactly Nissan has done to the 370Z for 2012.

SsangYong Korando gets a makeover for 2014

Mon, 09 Dec 2013

The 2014 SsangYong Korando (pictured) gets a facelift SsangYong have been on a bit of a mission to place the Korando as a perfect budget offering in the burgeoning Compact SUV market since it arrived in 2011. We’ve had the Korando SX arrive last year to tempt more buyers in, and a £1 million advertising campaign (focused on ‘economically challenged’ areas of the UK) to raise awareness, and now we get a facelift for 2014 to make the Korando more appealing. The facelift means a new grill, new headlights with LED driving lights, bigger air intake at the front, new lights at the back, new colours – Sunrise red, Cosmic blue and Carbonic grey - and some new wheels designs.

Ram introduces CNG-powered pickup

Tue, 06 Mar 2012

Aside from the Honda Civic Natural Gas, compressed-natural-gas-powered vehicles have usually been converted after the fact, generally for fleet use. Chrysler is hoping to carve out a niche in the corporate-pickup segment by selling a factory-built CNG Ram 2500 that can seamlessly switch over to gasoline operation when the natural-gas tanks run dry. The twin 4.6-cubic-foot CNG tanks (which store the equivalent of 18.2 gallons of gas) take up a section of the bed, while an eight-gallon gasoline tank provides fuel during start-up and then reserve capacity when the compressed tanks are tapped out, allowing the bruiser a measure of operational flexibility.