Engine Connecting Rod Bearing Set Dnj Rb4120 on 2040-parts.com
San Bernardino, California, United States
Pistons, Rings, Rods & Parts for Sale
- Amc 304 connecting rod jeep amc(US $20.99)
- Je piston set for big block chevy 257965 (open box)(US $682.52)
- Detroit diesel connecting rod r23515593 series 50 60(US $110.00)
- Beck/arnley 013-3731 engine piston ring set(US $25.00)
- Beck/arnley 013-8247 engine piston ring set(US $55.00)
- Goetze piston ring set for deutz bf4m1011f/bf4m1001f(US $125.00)
Volvo XC90 interior puts concept car trilogy into practice
Tue, 27 May 2014The Volvo concepts Coupe, XC Coupe and Estate have whetted the appetites of those keen to see new senior VP design president, Thomas Ingenlath's, renaissance of the brand since the former was shown in Frankfurt last September. The first product of these advanced design is the much-needed, all-new XC90 and Volvo has decided to lead its gradual unveiling with its interior. Led by new interior design director Robin Page – formerly head of Bentley interiors – the new SUV's cabin incorporates many of the concepts' elements, most notably the vertical, tablet-style center screen, incorporating Apple Carplay amongst its software.
Honda CR-Z Hybrid by 2010
Mon, 13 Jul 2009Honda are bringing the Honda CR-Z Hybrid to market next year, based on the CR-Z Concept from 2007 Honda’s first production Hybrid – the Honda Insight, recently called the worst car in the world – has not been a resounding success. True, it looks better than the Toyota Prius but – and we haven’t driven one yet so we can’t comment from our own experience – it’s not a great car. It has also been eclipsed – after a promising start – by the Toyota Prius, which has doubled its sales in Japan.
$5 billion competition on to replace Humvee
Mon, 04 Jun 2012Competition is heating up to win a contract for a vehicle that will replace nearly 18,500 aging military Humvees for the U.S. Army and Marine Corps starting in 2015. Six proposals are in play, with little time left before federal contracting officials decide on development of the $5 billion-plus program.