Evinrude E-tec Outboard 40hp Throttle Body And Tps Assy 5006454 on 2040-parts.com
Matthews, North Carolina, United States
Plumbing & Ventilation for Sale
- Yamaha outboard 60hp 4 stroke lower engine mount covers 6c5-44552-00-8d(US $29.95)
- Evinrude e-tec outboard 40hp air temp sensor assy 3010673(US $19.99)
- 3/8" brass coupling npt fitting pipe female thread nos(US $10.00)
- 1" extruded high pressure brass fitting elbow female npt thread high pressure(US $2.99)
- Marine air conditioning dometic ac unit controller(US $96.79)
- Mtu series 60 jabsco raw water pump 23525200 detroit diesel flexible impeller(US $449.99)
Ford Fiesta deliveries delayed, storm-damaged rail lines blamed
Tue, 13 Jul 2010Ford Motor Co.'s shipments of the 2011 Ford Fiesta subcompact to U.S. dealerships will be delayed by 10 days to two weeks because of storm-damaged railroad lines. Key railroads in northern Mexico were severely damaged by Hurricane Alex on June 30 and later by Tropical Storm Bonnie, said Angie Kozleski, a Ford spokeswoman.
Lamborghini Gallardo LP570-4 Spyder Performante
Thu, 18 Nov 2010Lamborghini today showed the world their new at the LA show - now take a deep breath - Gallardo LP570-4 Spyder Performante. And you thought Japanese brands loved a multi-faceted verbose car name. In simple terms the Performante is the Spyder version of the Superleggara. It's been on the same religiously slim-fast diet, adopting lots of carbonfibre (inside and out), swapping the standard car's leather for lightweight Alcantara, and receiving lightweight wheels.
Toyota's quake-hit Yaris plant offline for at least another month
Wed, 30 Mar 2011Toyota's quake-hammered Miyagi assembly plant, which makes the Yaris small car for export to the United States, is expected to be offline for at least another month. Workers have completed repairs at the factory and restored electricity, but the facility cannot get supplies of natural gas, a person familiar with the situation said. The assessment underscores the long road facing Toyota and other Japanese automakers in bringing plants back into full operation following the deadly quake, which killed more than 11,000 people, ruptured gas lines, shutdown electric grids and snarled logistics across half the country.