Find or Sell any Parts for Your Vehicle in USA

Fairchild Industries Weatherstrip Seal Rear Passenger Right Side New G3019 on 2040-parts.com

US $27.75
Location:

48 States Only, United States, US

48 States Only, United States, US
Returns Accepted:Returns Accepted Refund will be given as:Money back or exchange (buyer's choice) Item must be returned within:30 Days Return policy details:We will send you a replacement part or refund you the purchase price if you received a defective part, a part that was damaged in transit, a part is missing, or you received the wrong part. Please be prepared to send back the part you did receive. We will pay for the return shipping cost by emailing you a pre-paid shipping label with instructions for returning the part. Return shipping will be paid by:Seller Restocking Fee:No Warranty:Yes Part Brand:Fairchild Industries

Video: Tesla Model S Alpha undergoes on-track testing

Tue, 02 Aug 2011

The electric-car wizards at Tesla have released a sneak peek of the upcoming Tesla Model S Alpha undergoing on-track drive testing. The video provides a quick glimpse of three eerily quiet sedans, but not much more. Scintillating it's not, but it's nice to see the Model S Alpha sedan getting closer to production.

Gumpert Tornante by TOURING: It’s a good-looking Gumpert

Fri, 11 Feb 2011

The The Gumpert Tornante by TOURING (click for full image) There’s lot’s you can see about a Gumpert. Awesome performance and race car handling in a car that’s road-legal is a start. But one thing no one has ever said about the Gumpert Apollo is ‘My, that’s a good-looking car’.

GM to double size of battery lab

Mon, 12 Apr 2010

General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.