Fit For Honda Cbr 600 Rr 2005-2006 Bodywork Fairing Abs Plastics Set 41# on 2040-parts.com
HongKong, HK
Fairings & Body Work for Sale
- Fit for honda cbr 600 rr 2007-2008 bodywork fairing abs plastics set 23#(US $420.88)
- Fit for honda cbr 600 rr 2007-2008 bodywork fairing abs plastics set 24#(US $420.88)
- Honda goldwing gl1200-left- chrome engine cover oem(US $6.70)
- Fit for honda cbr 600 rr 2007-2008 bodywork fairing abs plastics set 22#(US $420.88)
- Fit for honda cbr 600 rr 2007-2008 bodywork fairing abs plastics set 20#(US $420.88)
- Fairing fit for yamaha yzf r1 r 1 yzf-r1 yzfr1 2000-2001 00 01 set 15 b y11(US $320.00)
Mazda reportedly to pull out of Michigan joint venture with Ford
Fri, 03 Jun 2011Mazda is reportedly pulling out of a joint manufacturing venture with Ford Motor Co. that was thought to be unprofitable for the Japanese carmaker. The site, AutoAlliance International, is about 25 miles south of Detroit and makes the Mazda 6 and the Ford Mustang.
Toyota ordered by Japan to address Prius brake complaints
Wed, 03 Feb 2010Toyota Motor Corp., already grappling with recalls totaling 8.1 million vehicles on five continents, has been ordered by Japan's Ministry of Transportation to investigate a rash of consumer complaints about braking problems in its popular third-generation Prius hybrid vehicle. The Japanese carmaker has received several complaints about braking in the Prius in both Japan and North America since the end of last year, Toyota spokeswoman Ririko Takeuchi said. She did not say when the directive was issued or how Toyota would respond.
Seat completes industry's largest solar panel installation
Mon, 25 Nov 2013SEAT HAS completed construction of the largest solar panel installation in the automotive industry. The huge 'Seat al Sol' array at the firm’s Martorell plant outside Barcelona is the size of 40 football pitches and generates 15 million kilowatt hours of power per year courtesy of the reliable Spanish sunshine. The electricity produced is enough to account for a quarter of the amount needed to build a year’s allocation of Leons, reducing the factory’s energy bills significantly and saving 7,000 tonnes of CO2 per year.