Fit Honda 00 01 Cbr929rr Cbr 929 Rr 2000 2001 Fairing Kit Abs Plastic I14 C03 on 2040-parts.com
Hong Kong, HK
Fairings & Body Work for Sale
- Fit honda 03 04 cbr600rr cbr 600 rr 2003 2004 fairing kit abs plastics a20 b02(US $283.00)
- Fit honda 07 08 cbr600rr cbr 600 rr 2007 2008 fairing kit abs plastics h42 a01(US $283.00)
- Fit honda 03 04 cbr600rr cbr 600 rr 2003 2004 fairing kit abs plastics a28 b02(US $283.00)
- Fit honda 03 04 cbr600rr cbr 600 rr 2003 2004 fairing kit abs plastics a94 c03(US $283.00)
- Fit honda 03 04 cbr600rr cbr 600 rr 2003 2004 fairing kit abs plastics a86 c03(US $283.00)
- Fit honda 07 08 cbr600rr cbr 600 rr 2007 2008 fairing kit abs plastics h34 a01(US $283.00)
Ford Transit van gets five-cylinder turbodiesel
Mon, 10 Dec 2012The full-size Ford Transit van that replaces the E-series Econoline in late 2013 will have a turbocharged five-cylinder diesel in its powertrain lineup. Today Ford uses the 3.2-liter engine in the Ranger pickup sold in international markets. The engine, which wears Ford's Power Stroke marketing name for diesel engines, is built in South Africa and will be exported to the Transit assembly plant near Kansas City, Mo.
Peugeot 107 facelift (2012) unveiled
Thu, 05 Jan 2012The Peugeot 107 gets a facelift for 2012 Peugeot has revealed a facelift for the 107, with new exterior styling, increased specification and reduced Co2. The Peugeot 107 is a fun little city car, as we discovered when we reviewed the Peugeot 107 in 2010, but it’s now getting towards the end of its life, with an all new car due in 2013. But to keep things fresh Peugeot has revealed a facelift for the 107 for 2012 to keep it selling through to the end of its life. That means a new nose, better interior and improved emissions and economy.
Councils to cut roadworks red tape
Tue, 19 Aug 2014COUNCILS in England could soon have the power to cut red tape and make road works much quicker and more accountable. The plan is to introduce permits for any company that wants to dig up a road, which means they will have to co-ordinate their work with other companies and local authorities to reduce the impact of delays on the public. The permit scheme could come into force as early as April 2015 and means anyone applying for a permit to carry out road works will need to present a convincing case for the work.