Fit Suzuki 07 08 Gsxr 1000 Gsx-r 2007 2008 Fairing Bodywork Plastics K7 I7 C13 on 2040-parts.com
Hong Kong, HK
Fairings & Body Work for Sale
- Fit yamaha yzf r1 04 05 06 yzfr1 2004 2005 2006 fairing kit bodywork e29 b12(US $318.00)
- Fit suzuki 05 06 gsxr 1000 gsx-r 2005 2006 fairing bodywork plastics k5 e27 a11(US $363.00)
- Fit suzuki 07 08 gsxr 1000 gsx-r 2007 2008 fairing bodywork plastics k7 i39 c13(US $353.00)
- Fit suzuki 05 06 gsxr 1000 gsx-r 2005 2006 fairing bodywork plastics k5 e3 a11(US $363.00)
- Fit yamaha yzfr6 98 99 00 01 02 yzf r6 1998 1999 2000 2001 2002 fairing h5 b12(US $318.00)
- Fit suzuki 05 06 gsxr 1000 gsx-r 2005 2006 fairing bodywork plastics k5 e35 a11(US $363.00)
Peugeot RCZ GT THP 1.6 156 Review & Road Test (2010) Part 3
Tue, 21 Sep 2010Peugeot RCZ Review - The striking Double Bubble Roof Even though you can see the interior of the RCZ is 308 titivated, it’s still a decent place to be with its leather, embossed sports seats and a decent number of toys. And the rather less than accurate SatNav which always seems to have a brainstorm wherever I want to go and sends me somewhere else. And it’s not just in the RCZ; I have the same problem in every Peugeot I’ve driven recently.
College Exhibition: Elisava Design Degree Show 2004
Fri, 26 Nov 2004Nov 26, 2004 - Graduating students from the Transportation Design Masters program at Spain's Elisava School of Design presented their work in the 2004 Degree Show entitled 'Mobility Techniques' held in July at the Mies van der Rohe Pavilion, in Barcelona. Go to Photo Gallery 120 photos The projects shown are based on a wide vision of transportation design and take into consideration mobility, aerodynamics, environmental impact, ergonomics, legislation, materials, production, security, technology and aesthetic principles. They also aim to provide strategic solutions of design that can generate a new commercial and brand potential for industry.
London underpass to hold flood water
Mon, 10 Feb 2014A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.