Find or Sell any Parts for Your Vehicle in USA

Floor Mats All Weather Custom Tpe Rubber Liners For Ford Fusion 2013-2016 on 2040-parts.com

US $97.67
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:VIWIK Manufacturer Warranty:5 Years Manufacturer Part Number:Does not apply Type:Rubber Mat Material:Eco-Friendly Low Density Polyethylene Color:Black Placement on Vehicle:Front, Rear, Left, Right, Second Row Fitment Type:Direct Replacement UPC:Does not apply Feature 1:Raised spill saver lip Feature 2:Textured skid-resistant surface Brand Type:Aftermarket Branded Feature 3:Stain-resistant, all weather durability, washable Includes:Coverage For First Row And Second Row Seats Only

Floor Mats & Carpets for Sale

Chrysler recalls some 2010 Jeep Wranglers over fire risk

Tue, 22 May 2012

Chrysler is recalling automatic-transmission-equipped 2010 Jeep Wranglers for a problem with the transmission skid plate. The plate, meant to protect delicate parts from rough terrain, can collect debris near the catalytic converter. That can lead to a fire.

Video: Possible new Pantera spotted in Italy

Thu, 05 May 2011

A YouTube video shows what appears to be the newest evolution of the hallowed De Tomaso Pantera. Caught leaving the De Tomaso factory in Grugliasco, Italy, the heavily camouflaged two-door coupe did not muffle the brawny engine sound. The rumor mill is speculating about a V8 powerplant sourced from Ford, like the original, and an aluminum body.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.