Floor Mount Dimmer Switch For 67-72 Chevy Trucks on 2040-parts.com
Portland, Oregon, United States
Other for Sale
- Gm / chevy self-resetting in-line 20 amp circuit breaker 12v wiring(US $4.00)
- Msd ignition 8190 10 male pins and seals(US $9.99)
- Msd 8920 magnetic pickup tachometer adapter(US $81.70)
- New in box--------msd 8762 boost timing master for use with msd ignition control(US $274.00)
- Car 2 post battery terminal quick disconnect cut/shut on off safety kill switch(US $23.89)
- New open box summit racing 830050 battery disconnect switch rotary 250 continuou(US $26.50)
Abarth Fiat 500 Convertible confirmed. Punto Abarth coming?
Mon, 12 Oct 2009It looks like plans for an Abarth version of the 500C for 2010 are confrmed But a successful model is always going to spawn whatever variants a car maker can viably muster, so our report in July that we will see an Abarth version of the 500C in Spring 2010 – probably at the Geneva Motor Show – now seem to have been confirmed as ‘jokeforblog’ has published pictures of what seems to be a road-ready Abarth Convertible at Abarth’s facility. Now that will be a bunch of fun – and just in time for next Summer. Spy shot of the Abarth 500 Cabriolet It also now seems likely that Fiat are pushing ahead with a new Abarth version of the Punto.
Mustang GT (2011) – First pictures Leak
Sat, 26 Dec 2009The leaked picture of the 2011 Ford Mustang GT 5.0 litre See, stuff does happen over Christmas. Even if it is unofficial stuff. A week or so ago we ran a couple of interesting Ford Mustang stories.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.