For Honda 2005-2006 Cbr 600 Rr 600rr F5 Fairing 5h on 2040-parts.com
default, default, CN
Fairings & Body Work for Sale
- For honda 2007-2008 cbr 600 rr 600rr f5 fairing 7a(US $525.99)
- For honda 2008-2009 cbr 1000 rr 1000rr fairing 8l(US $611.99)
- For honda 2007-2008 cbr 600 rr 600rr f5 fairing 7r(US $525.99)
- For honda 2008-2009 cbr 1000 rr 1000rr fairing 8r(US $611.99)
- For honda 2007-2008 cbr 600 rr 600rr f5 fairing 7i(US $525.99)
- For honda 1999-2000 cbr 600 cbr600 f4 fairing 9e(US $576.99)
Spy shots: Aston Martin DB9 replacement spotted
Mon, 26 Mar 2012Fresh from the Autoweek in-box, we bring you these new spy photos of Aston Martin's DB9 successor, lightly camouflaged and frolicking in the snow. To paraphrase digital editor Andy Stoy, the bad news is it that looks like every other Aston. But the good news is that it looks like every other Aston.
Mercier-Jones Supercraft: the world’s fastest hovercraft
Tue, 15 Apr 2014Claiming a “world first” is quite easy. Simply make an extremely niche vehicle, cram as many words into its description as possible, then you can claim pretty much anything. Take the Mercier-Jones Supercraft - “the world’s first luxury high-performance hovercraft”.
Jaguar Land Rover open new engineering test centre in Dubai
Sun, 12 May 2013Jaguar Land Rover are growing at a tremendous rate, and that means more and more testing of cars to make sure they can cope with the extremes of climate they’re subjected to by owners around the world. So as part of their growing test programme, JLR have extended their testing and engineering facilities in the Al Barsha area of Dubai so they can test durability, calibration and hot weather testing for heat and humidity as well as test the powertrains, chassis, HVAC and, as this is Dubai and it has plenty of sand, they can also give the Land Rover Terrain Response systems a proper workout. JLR has been hot weather testing in Dubai for more than 12 years – an area where temperatures can reach 50 degrees Celsius – and the new facility replaces a much smaller one in the same area, and joins Jaguar Land Rover’s other test facilities at the Nurburgring, Arjeplog in Sweden and Phoenix and International Falls in the States to ensure all JLR’s new cars get subjected to everything from extreme hot and cold to track work.