Find or Sell any Parts for Your Vehicle in USA

For Western 49308 1315315 49317 1315310 Truck & Plow Side Repair Harness 9 Pin on 2040-parts.com

US $46.71
Location:

Bordentown, New Jersey, United States

Bordentown, New Jersey, United States
Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:car-one-2088 Interchange Part Number:1315310, 1315315, 49308, 49317, 49366, 49366K Manufacturer Part Number:W49366K Features:Straight Blade Part Type:Wiring Harness UPC:Does Not Apply

GM to sell bifuel Chevrolet and GMC trucks

Wed, 18 Apr 2012

While gasoline hovers at about four bucks a gallon, natural gas is priced at the equivalent of $1.89 per gallon. Chevrolet and GMC are hoping to take advantage of that disparity by offering bi-fuel heavy-duty pickups for fleet and retail customers beginning on April 19, the day before Earth Day. The bi-fuel option will cost buyers $11,000, on top of the price of the pickups.

IAM Highlights Concerns Of Driving With Dementia

Thu, 03 Apr 2014

THE Institute of Advanced Motorists (IAM) has revealed through a new survey that a decline in cognitive abilities – for example the onset of dementia – is the greatest concern that families have about elderly relatives driving. Forty-two per cent of people who have concerns about an older relative driving have tried to discuss this with them. According to the IAM, people with dementia may still be able to drive safely for some time after it has been diagnosed, but because of the progressive nature of the disease, there will come a time when they have to give up.

Jaguar Land Rover installs UK's largest solar roof

Tue, 08 Apr 2014

THE LARGEST EVER solar panel roof has been completed at the Jaguar Land Rover (JLR) engine factory in South Staffordshire. More than 21,000 solar cells have been fitted to the roof over the Engine Manufacturing Centre and will provide enough electricity to power 30% of the factory’s needs. When the solar panels are working at full capacity, they will generate enough energy to power the equivalent of 1600 homes.