Find or Sell any Parts for Your Vehicle in USA

Ford Ranger Stx Oem Nos F37z-1320000-dg Body Stripe Kit Passenger Side Only on 2040-parts.com

US $125.00
Location:

Clinton Township, Michigan, US

Clinton Township, Michigan, US
Returns Accepted:ReturnsNotAccepted Brand:Genuine Ford Manufacturer Part Number:F37Z-1320000-DG

 Hello and thanks for looking..

Here we have a complete passenger side body stripe decal kit:

This was leftover from 1993 Ford Ranger STX w/ ext. cab

Genuine Ford OEM part # F37Z-1320000-DG
Colors in this kit Blueberry/Silver (see pic)


please research to make sure this will work for your application
*Sold as-is no returns.

Bid w/ confidence!
Official PayPal Seal
100% Feedback!

Alfa Romeo & Mazda to build new roadster

Wed, 23 May 2012

Mazda & Alfa to jointly develop a new roadster Alfa Romeo and Fiat have signed an agreement to build a new new RWD roadster based on the next generation Mazda MX-5 platform. Sergio Marchionne is a big believer that the only way to survive as a mainstream car maker is to be as big as possible and share development costs whenever you can. Which explains – from the Fiat point of view – why Alfa Romeo has entered in to an agreement to produce a new roadster with Mazda to be based on the next generation Mazda MX-5 RWD platform.

Free Regent Street Motor Show to showcase past, present and future

Mon, 21 Oct 2013

A GLORIOUS MIX of old and new will descend on the capital in early November as the Regent Street Motor Show returns. On Saturday 2nd November Regent Street closes to traffic from Piccadilly Circus to Oxford Circus, allowing over 300 cars to go on display in a free show for the public. The display will include as many as 100 pre-1905 veteran vehicles which will compete in the EFG International Concours d’Elegance and then take on the London to Brighton Veteran Car Run the following day - the oldest competitive driving event in the world.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.