Fork Triple Tree For 1984 Honda Shadow- Good Condition on 2040-parts.com
Eden Prairie, Minnesota, US
Thanks for clicking. Up for auction is a used but good condition triple tree taken off a 1984 Honda VT700 Shadow. Included is the upper tree and the shaft although I'll include the two dust rings. Shipping is to the lower 48 states only- no international shipping. This part may fit other models/years but please do your own research before bidding. Happy Bidding!
Other for Sale
- 1983 kawasaki kz550 ltd seat hinge pin + clip we ship quickly evey day! kz 550(US $10.84)
- 1995 yamaha rt180 tank mount center tank mount strap cushion no cracks or taers*(US $8.89)
- 1982 suzuki gs300 front sprocket 15 tooth teeth over 1000 parts in stock*(US $14.20)
- 1983 kawasaki kz550 ltd front frame cover trim kz 550 over 1000 parts in stock*(US $7.47)
- 1972 honda cb750 four timing chain tensioner and mount bolts fast shipping*(US $13.39)
- 1982 yamaha xj650 maxim gas tank rubbers over 1000 parts in inventory*(US $9.15)
Hyundai Intrado concept car (2014) points to future tech and designs
Sun, 15 Dec 2013Hyundai This is the first look at Hyundai's new Intrado concept car - due to bow in at the 2014 Geneva Motor Show. It's the first car to be designed under the company's latest styling rulebook, dubbed Fluidic Sculpture 2.0. Hyundai's new design chief, Peter Schreyer, told MSN Cars the Intrado defied pigeonholing.
Show Review: Goodwood Festival of Speed 2011
Tue, 12 Jul 2011The Goodwood Festival of Speed began 19 years ago. Back then, it amounted to little more than a glorified hill climb for historic racecars. Since then, it has grown to become the biggest event in the UK automotive calendar outside of the Grand Prix, and takes over Lord March's West Sussex Estate annually on the first weekend of July.
Britain to be third global production site for the Nissan Leaf EV after Japan, U.S.
Thu, 18 Mar 2010Nissan Motor Co. said it will build the new Leaf electric vehicle at Britain's Sunderland assembly plant starting in early 2013, with initial capacity of 50,000 units. The Japanese company and its French alliance partner Renault will invest more than $642.6 million in the project, including the construction of a lithium ion battery plant on the site.