Forza Ferrari Magazine Collection on 2040-parts.com
San Francisco, California, United States
Ferrari FORZA Magazine Collection, 115 Issues. #25 through 151. Will only sell complete set. Very very good condition and many issues are still in the plastic covers. Cash only, no trades. Will give discount for local pickup.
|
Ferrari for Sale
- Original ferrari f40 workshop manual & 2 f40 sales brochures(US $975.00)
- Space-sonic 8 track slim type hi fi car stereo model bbc-147 (nib)(US $149.95)
- Ferrari official 458 speciale brochure still in it's original shrink wrap(US $89.99)
- Ferrari licenced mini mugs box of two(US $64.75)
- Ferrari 166 inter/millemiglia reprint instructions for use & maintenance manual(US $172.98)
- Ferrari california t( restraint systems)
MINI to launch in India early 2012
Mon, 17 Oct 2011MINI to launch in India early 2012 For some reason, we assumed that the MINI was already sold in India. But it isn’t. But from early 2012 you’ll be able to pop down two one of two showrooms in Delhi, or one in Mumbai, and pick up a MINI from the first showrooms to stock the motoring icon in India.
2012 Mercedes A-Class teased on video
Sat, 21 Jan 20122012 Mercedes A-Class teased on video The 2012 Mercedes A-Class is being teased on video ahead of a Geneva 2012 debut in conjunction with a ‘QR Code’ competition. With Detroit pretty much done and dusted, it’s time for car makers to begin teasing their offerings for Geneva 2012 (which we saw some of even before Detroit). Today it’s the turn of Mercedes with a video tease for the 2012 Mercedes A-Class, coupled with a competition too (although that seems to be just for Germany).
GM to double size of battery lab
Mon, 12 Apr 2010General Motors says it will spend $8 million to double the size of its Global Battery Systems Lab, which the company claims is the largest and most technologically advanced automotive battery lab in the United States. GM says the expansion will speed up the development of hybrid and electric vehicles, such as the upcoming Chevrolet Volt, by improving on-site testing of battery cells and systems. When finished, the lab will be 30,000 square feet bigger than it is now, for a 63,000-square-foot total.