Freightliner Classic Heater Control Panel(no Controls) on 2040-parts.com
Idaho City, Idaho, US
Heater control panel with 2 holes for power mirrors, 1 mirror heat, and wiper
For FLD Classic and other FLD's. From 2000 Classic
Commercial Truck Parts for Sale
- 77-1520 thermo king fan shaft (US $42.95)
- Thermo king 77-1807 pillow block flange bearing w/ grease nipple new(US $44.95)
- 77-2042 thermo king fan shaft (US $42.95)
- 77-1807 thermo king pillow block flange bearing w/ grease nipple new(US $44.95)
- Freightliner classic heater control panel(no controls)(US $3.00)
- New fuller frof13210c transmission assembly - 737795(US $3,500.00)
Nissan GT-R 2010 UK updates
Tue, 10 Nov 2009Nissan has revealed the changes to the 2010 GT-R At the Tokyo Motor Show Nissan brought along the 2010 Nissan GT-R with a raft of minor tweaks and adjustments for their supercar killing four seat coupe. We thought that they’d probably be available just in Japan to kick off with (the 2010 GT-R launches there in December) but Nissan has sent us the 2010 updates for the GT-R for the UK and Europe this afternoon, so it looks like it’s updates round the world. Just about all the changes are under the skin for the GT-R.
Renaultsport Megane N4 rally car (2010) first pics
Wed, 08 Dec 2010Renault's added the new Megane Renaultsport N4 to its current rally range. The N4 draws on a group of heritage Renaults stretching over a quarter of a century - including the 5 GT Turbo, R11 Turbo, R21 Turbo, R19 16V, Clio Williams and Clio Renaultsport. To cope with all sorts of terrain, the Megane uses three-way adjustable shock absorbers.
BID TO SLOW TRAFFIC ON M3 STRETCH
Fri, 14 Feb 2014FIRST it was a stretch of the M1 and now the same speed reduction plan has been announced for a stretch of the M3 motorway in Surrey and Hampshire. The Highways Agency (HA) has proposed that a three-mile section of the M3 between junction 3 at Lightwater in Surrey and junction 4 near Farnborough in Hampshire be subject to a 60mph restriction. This section is part of a 13.4-mile stretch that is being upgraded in a £174 million scheme, with the 60mph proposal, to operate between 7am and 7pm daily so air quality levels can be met.