Find or Sell any Parts for Your Vehicle in USA

Front Left Door Window Regulator Repair Kit For Volvo C70 Cabrio Convertible Cc on 2040-parts.com

US $50.01
Location:

İstanbul, default, Turkey

İstanbul, default, Turkey
Condition:New Brand:VALEAGRUP Warranty:Yes Other Part Number:VWR1050 Country/Region of Manufacture:Turkey Placement on Vehicle:Left, Front Manufacturer Part Number:Volvo C70 Cabrio UPC:Does not apply

Welcome to my eBay store
 
STORE CATEGORIES



Window Regulator Repair Kit Front Left Door
 for Volvo C70 Cabrio Convertible CC 1997-2004

 

  • Quality Products
  • Made in Turkey
  • Fast Shipping
  • Tracking Number will be Provided
We have plenty different items for different type of cars;

Please Contact For Other Items!!!

Product Details

Window Regulator Repair Kit Front Left Door
 for Volvo C70 Cabrio Convertible CC 1997-2004


Applications
  •  
  • Volvo C70 Cabrio Convertible 
  • CC 1997-2004
Product SKU
  • VWR1050
OEM Number (only for comparison)

Condition
  • New
Package Quantity
  • 1 SET













  • The item will be sent after packing carefully.
  • Tracking number will be provided.
  • We ship the items in 24 hours through Turkish Postal System.
  • During the holidays delivery can be longer.
  • Shipment method can be changed according to your choice, Express or Shipment.
  • You will receive the tracking number after sending the itemPlease DO NOT forget; we are not carrying the items to you. We just deliver to selected carrier’s office in an promised time frame!!!
  • Delivery Time for Express Shipment is 2-5 business days,

  • About Standard Shipment;

  • Some countries have strick customs rules and multiple transferring centers and parcels can be waited longer, such as South American countries, Mexico, Malta, etc. Please if you need this item urgently, buy with the Express Shipment option.
  • United States, Europe, Middle East, Russia and North African Countries: 10-15 business days
  • Far East Countries, Australia: 15-25 business days
  • South America, Middle and South African Countries: 14-60 business days

• We accept the payment via Paypal
• Please purchase and pay for the item through the eBay

  • Please notify us before sending the item back.
  • You may send the item back if you receive the wrong or faulty item.
  • We can send the new item again if you want.
  • We will refund your payment back if you want.
  • If there is no wrong or faulty items, only the item’s payment will be refunded.

  • We accept the payment via Paypal.
  • Please purchase and pay for the item through the eBay.
Business Information:
Valea Auto Parts
Girne Mah.Irmak Sok. 38/3 
34852 Maltepe Istanbul 
Turkey
VAT Number:37243016130
Phone: 00905334866352


 
Check my other items!!!
   

inkFrog logoinkFrog logo
inkfrog terapeak


inkFrog Analytics

Simple Rule: Technology Costs

Mon, 22 Oct 2012

Close your eyes. Imagine you're at the turn of the 20th century. A favorite broadsheet tells you that these new-fangled automobile gadgets are dangerous rattle traps that foul the air and that they are singularly profound failures!

Renault’s electric cars ‘will cost the same as its diesels’

Tue, 28 Apr 2009

By Richard Yarrow Motor Industry 28 April 2009 12:10 Three electric vehicles (EVs) in development by Renault will cost the same as the equivalent diesels in Britain, the company has confirmed to CAR Online. Battery-powered electric Renaults are expected to cost from around £15,000 when they arrive in the next couple of years. The announcement takes into account the UK Government’s £5000 EV incentive scheme announced earlier this month.

London underpass to hold flood water

Mon, 10 Feb 2014

A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night.