Find or Sell any Parts for Your Vehicle in USA

Front/rear Swaybar End Link 2002-2007 Subaru Impreza Sedan/wagon Wrx Sti on 2040-parts.com

US $145.99
Location:

McKinney, Texas, US

McKinney, Texas, US
Returns Accepted:Returns Accepted Refund will be given as:Money back or exchange (buyer's choice) Item must be returned within:14 Days Return policy details:All sales are final, no refunds are available. We can only issue an exchange if the item is received defective or incorrect was item shipped. All exchange items MUST be in brand new condition which means the item is never installed and kept in the original packaging, otherwise a 15% restocking fees will be charged. If Buyer bought wrong item, and asks for a refund, a 15% restocking fee will be charged. We will not resend product before we get the returned item from customers. All shipping and handling fees are non-refundable in any circumstances. Please inspect your order upon receipt. No claims will be honored after 14 days of delivery. All items are brand new unless otherwise stated. Professional installation is highly recommended. Buyer assumes all risk on shipment and usage. Item is auction "AS IS", unless the warranty is stated in item description. We do not answer emails on weekend, and we will reply all emails in the order it was receive. Return shipping will be paid by:Buyer Restocking Fee:No Other Part Number:SBEL SBF 0207GD & SBEL SBR 0207GD


https://lh6.googleusercontent.com/_agAuYCxaItc/TYqIVn6q4ZE/AAAAAAAAABY/lKRVGAP6MtY/s144-c/Mar232011.jpg


Item Description

 

Front/Rear Swaybar End Link

2002-2007 Subaru Impreza Sedan/Wagon

Description

100% Brand New

Anodized Aluminum, Gold finish

High Quality Anodized Aluminum

Polyurethane Bushing

Perfect for any Aftermarket Sway Bar

One set includes front and rear end links

Fitment Guarantee / Easy to Install

You get what is in the picture


Applications

2006-2007 Subaru Impreza 2.5i Wagon/ Sedan

2002-2007 Subaru Impreza WRX Wagon/Sedan

2004-2007 Subaru Impreza WRX/STi Sedan

 

Includes everything in Picture.
Instructions not included. Professional installation recommended.





Powered by eBay Turbo Lister
The free listing tool. List your items fast and easy and manage your active items.

Driverless 'pods' to hit Milton Keynes

Mon, 11 Nov 2013

DRIVERLESS cars will transport people through the streets of a British town in a £1.5 million project aimed at boosting green technology. From 2015 an initial batch of 20 driver-operated "pods", which will be able to carry two people, will be run on designated pathways separated from pedestrians in Milton Keynes. But by mid-2017 it is planned that 100 fully autonomous vehicles will run on pathways alongside people, using sensors to avoid collisions with obstacles.

Aston Martin V12 Vantage (2009): first official pictures

Wed, 04 Feb 2009

By Tim Pollard First Official Pictures 04 February 2009 09:00 Aston Martin today unveils the new V12 Vantage – the production version of the 2007 concept car. No prizes for guessing this car’s remit: it’s the beautiful Vantage bodyshell (now four years old!) stuffed with six litres and 12 cylinders of Aston muscle. The V12 Vantage will be shown at the 2009 Geneva motor show on 3 March.

Lamborghini CO2 reduction Press Release

Sun, 07 Jun 2009

Lamborghini CO2 Reduction Press Release • The construction of a large photovoltaic plant, combined with an energy-saving project, will achieve a 30% reduction in the factory’s CO2 emissions by 2010 • Modifications to vehicles will result in a 35% reduction in CO2 emissions by 2015 Automobili Lamborghini announces its intention to complete its program of environmental sustainability in record time by presenting new plans which will enable the company: The plans for reducing emissions will thus involve two areas: modifications to the Lamborghini factory in Sant’Agata Bolognese, and development in vehicle design. To redefine its industrial processes in accordance with its policy of environmental sustainability, Lamborghini has just begun a project to complete installation of a large photovoltaic system by the end of 2009. The roof-top plant will produce 1,582 Megawatt hour (MWh) of “green” energy per year, which translates into a 20% reduction in CO2 emissions (-1,067,820 Kg/year) by 2010.