Find or Sell any Parts for Your Vehicle in USA

Fusion Cab000853-06 Black Extension Cable 5 Pin 19' Feet Marine Boat on 2040-parts.com

US $19.95
Location:

Franklin, Wisconsin, United States

Franklin, Wisconsin, United States
Condition:New other (see details) Brand:FUSION Manufacturer Part Number:CAB000853-06 UPC:N/A

I am selling a black Fusion extension cable part number cab000853-06.  It measures roughly 19' feet long measured from tip to tip.  It is new and comes as shown in pictures.  For more information contact a dealer in your area.  ( KW / U4A / 9044666 )  (3)




Shipping cost is for the continental United States only.  For shipping cost outside of the continental United States please inquire about shipping cost before bidding.



2010 Audi A8 to launch in Miami

Thu, 19 Nov 2009

The Audi Pavilion at Design Miami USA where Audi will reveal the 2010 A8 The long, drawn-out saga of the next generation Audi A8 is finally being resolved with the announcement that Audi are going to launch the A8 on the eve of the Design Miami USA event – 30th November. Which does seem a bit of an odd place for a mainstream, high-end car maker to launch its new flagship. Are Audi saying that the new A8 is all about design, rather than performance or luxury or, quite frankly, anything else?

Chrysler developing new supercharged Hemi V8

Mon, 20 May 2013

Chrysler Group is developing a supercharged Hemi V8 with power approaching the 640 hp of the SRT Viper's V10. The 6.2-liter engine, code-named Hellcat, is expected to debut on the next-generation Dodge Challenger and perhaps other vehicles, according to sources within Chrysler. The engine's existence was revealed on the Internet site Allpar.com and confirmed by Chrysler insiders.

Repair work to hit key road route

Tue, 24 Sep 2013

A KEY ROAD ROUTE into London will be affected by closures at some weekends next summer for the completion of repair work. The summer 2014 work will be on the Hammersmith Flyover on the A4 in west London. Before that, there will be night-time lane closures starting next month as the final phase of work to strengthen the flyover's 16 spans begins.