Garmin Gns-530w Waas Gps Nav/com W/terrain on 2040-parts.com
Minneapolis, Minnesota, United States
GPS for Sale
- Garmin aera 796 touchscreen aviation gps(US $950.00)
- Garmin gns 530 non-waas gps/nav/comm 14/28vdc p/n 011-00550-10(US $4,000.00)
- Garmin gnc 255 panel mount com/nav s/n 6mm014398(US $4,560.00)
- Bendix king kln 89b gps 066-01148-0101(US $429.00)
- Garmin 530gns 530aw waas 16 watt with tray(US $5,800.00)
- Garmin gps receiver gns430 011-00280-10 w/ july 2024 repaired 8130(US $5,350.00)
GM to build Cadillac ELR in Detroit
Tue, 16 Oct 2012General Motors confirmed Tuesday that it will build the Cadillac ELR extended-range plug-in hybrid at the same plant that builds the Chevrolet Volt and Opel Ampera hybrids. GM said it will spend $35 million on the Detroit-Hamtramck Assembly plant to add the Cadillac. GM North America president Mark Reuss said production of the ELR is set to begin in late 2013.
Happy New Year! Our Top 12 Car News stories of 2012 – month by month
Tue, 01 Jan 2013Happy New Year to one and all from all of us here at Cars UK. We take a look back at the top car news story on Cars UK for every month of 2012. As it’s New Years Day 2013, it seems the right time to take a look back at the top car news stories of 2012.
New Range Rover gets Bridge of Weir Leather
Mon, 22 Oct 2012The new Range Rover (2013) is getting its sumptuous leather interior courtesy of Bridge of Weir Low Carbon Leathers Land Rover’s supplier of choice for the Range Rover’s leather is Bridge of Weir Leather Company, part of the Scottish Leather Group and a privately owned Scottish Company that just happens to be the UK’s only automotive leather manufacturer (although they may need to rephrase that in a couple of years if Alex Salmond gets his way). The big shout is that Bridge of Weir’s leathers are low carbon, but what’s more interesting than the trendy (and, some would say, pointless) shout out is just how efficient Bridge of Weir are. The Bridge of Weir factory has its own Thermal Energy Plant which provides 70 per cent of its needs (and will provide it all by 2015) and all the waste products are recycled instead of being discarded.