Find or Sell any Parts for Your Vehicle in USA

Gates Engine Water Pump For 1991-2000 Chevrolet C2500 7.4l V8 Coolant My on 2040-parts.com

US $67.69
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:Gates Type:Engine Water Pump Manufacturer Part Number:SX-0889 2000 1999 1998 1997 1996 1995 Manufacturer Warranty:Recommended Service Interval Item Height:7.900 Item Width:9.100 Item Length:15.100 Interchange Part Number:Dayco CARQUEST C853 Ford ACDelco GM 31-38 Compatible Make:Chevrolet Compatible Model:C2500 Compatible Year:2000 1999 1998 1997 1996 1995 1994 1993 1992 1991 Core Charge:Free - No Core Charge Fitment Type:Direct Replacement Bundle Description:1 pc Genuine Gates Engine Water Pump UPC:Does not apply

Water Pumps for Sale

GM Sale to Magna Cancelled

Wed, 04 Nov 2009

GM has cancelled the sale of Opel and Vauxhall to Magna It’s been fraught with problems from the start, but what fire-sale isn’t? The unions have been unimpressed with what Magna were offering. The EU has had a pout and a stomp about the sale.  Lord Mandy has said lots but done little.

Family releases fatal motorcycle crash video

Fri, 05 Sep 2014

A BEREAVED FAMILY has released shocking video clips of a motorcyclist's road death in a bid to highlight the dangers on our roads. David Holmes, 38, was killed on the A47 in Norfolk in June last year. He was travelling at 97mph when a car crossed into his path.

Webinars: RTT Realtime Design & Engineering Reviews

Wed, 06 Apr 2011

Car Design News hosted Realtime Design & Engineering Reviews Using High-End 3D Visualizations with RTT on April 6, 2011. This particular webinar explored how Virtual Reality is becoming increasingly important in the product development process. Thanks to new visualization and simulation, technologies are minimizing dependence on physical prototypes, which in turn create massive cost and time savings.