Find or Sell any Parts for Your Vehicle in USA

Gearwrench 890040 39 Pcs. Vortex Socket Set on 2040-parts.com

US $69.55
Location:

Northeast, US

Northeast, US
Returns Accepted:Returns Accepted Refund will be given as:Money back or exchange (buyer's choice) Item must be returned within:14 Days Return shipping will be paid by:Buyer Restocking Fee:No Manufacturer Part Number:890040 Part Brand:Gearwrench Warranty:Yes

Obama's second term: More EVs, safety

Wed, 07 Nov 2012

President Barack Obama's second term likely will include a return to an agenda of support for electric vehicles and also could clear the way for new rules on tailpipe emissions and auto safety that his appointees have been eager to release. Obama's fellow Democrats retained control of the Senate, while Republicans kept their House majority In his victory speech, Obama said he plans to meet with Republican challenger Mitt Romney in coming weeks to discuss ways to move the country forward. He also saluted Romney's father, George, who once ran American Motors, a company absorbed by Chrysler in 1987 and whose Jeep became a flashpoint during the campaign.

Nissan GT-R 2011/2012 tweaks leak out

Wed, 25 Aug 2010

The Nissan GT-R 2011 (2012 MY) Nissan don’t seem to be able to stop tweaking, nipping and tucking the Nissan GT-R, so it comes as no surprise to see that there are more changes planned for the 2012 MY (for which read 2011 everywhere bar the USA). We’re expecting those to surface around the same time this year – November – as the 2010 Nissan GT-R updates did last year GTR Blog are reporting the changes well ahead of anything official, but they look as if they’ve got some solid information so it’s worth repeating for the many GT-R nuts out there. Having nipped and tucked endlessly, it looks like Nissan are going to continue the trend for next year’s GT-R.

Green Light For More Smart Motorway Schemes

Wed, 09 Jul 2014

THE Government has announced plans to speed up journey times on selected parts of the nation’s motorway network. As a result, work will start to convert the hard shoulder into a running lane on two sections of the M1 and on a stretch of the M3. The M1 work will be between junctions 28 and 31 in Derbyshire and between junctions 32 and 35a in South Yorkshire, with claims that it will boost capacity by up to a third and improve journey times by up to 10%.