Find or Sell any Parts for Your Vehicle in USA

Genuine Gm Gasket 24576382 on 2040-parts.com

US $31.44
Location:

ID, United States

ID, United States
Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:GM SKU:24576382 Manufacturer Part Number:24576382 Product Name:Genuine GM Gasket 24576382 Genuine OEM:Yes Manufacturer Warranty:1 Year Fitment Type:Direct Replacement Make:Pontiac Chevrolet Oldsmobile Buick Model:Grand Am Malibu Alero Skylark Cavalier Achieva Sunfire Year:1996 1997 1998 1999 2000 2001 Parts Included:ONLY PART REFERENCE #2 ON THE DIAGRAM IS INCLUDED Replaces Part Number:24574082

Barrett-Jackson to auction first production SRT Viper for charity

Thu, 12 Apr 2012

The first production 2013 SRT Viper will cross the block at Barrett-Jackson's Orange County auction, taking place June 22-24. Proceeds from the sale will benefit the Austin Hatcher Foundation for Pediatric Cancer, the American Le Mans Series' official charity. The foundation's mission is to curb the effects of childhood cancer and improve affected children's quality of life.

Honda recalls Civic hybrids for converter failure

Thu, 03 Mar 2011

Honda is recalling 36,656 of its 2006- and 2007-model-year Civic hybrids to replace the DC-to-DC convertor. The converter may fail and cause the engine to stall and the headlamps to malfunction. The DC-to-DC converter is part of the Integrated Motor Assist hybrid-control system, according to Honda.

Nissan UK Battery plans confirmed

Mon, 20 Jul 2009

Nissan - the Renault Nissan Alliance - has confirmed plans for car battery production in the UK and Portugal The aim of the battery production plants is to supply batteries for electric cars built by the Renault Nissan alliance, but Nissan haven’t actually said that they will build any electric cars in the UK. Hmm. The target production is 60,000 annually to be used in a range of Nissan and Renault electric cars that will start to hit the market next year (2010) – in the US and Japan – with full global roll-out by 2010.