Find or Sell any Parts for Your Vehicle in USA

Genuine Gm Turbocharger Gasket 12677294 on 2040-parts.com

US $37.84
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions SKU:12677294 Product Name:Genuine GM Turbocharger Gasket 12677294 Genuine OEM:Yes Manufacturer Warranty:1 Year Fitment Type:Direct Replacement Make:Chevrolet GMC Year:2017 2018 2019 2020 2021 2022 2023 Parts Included:ONLY PART REFERENCE #2 ON THE DIAGRAM IS INCLUDED Brand:GM Genuine Parts Manufacturer Part Number:12677294

Nissan Sentra [w/Gallery]

Mon, 03 Sep 2012

Nissan has unveiled its all-new 2013 Sentra, the third of five new vehicles being introduced in a 15-month period. The new Sentra – which measures in at 4,625mm long, 1,760mm wide and 1,496mm high – is 68kg lighter than its predecessor while still having larger overall dimensions and a more spacious interior. Sitting on a wheelbase of 2,700mm, the Sentra adopts the automaker's new signature trapezoid-shaped grille and large wraparound headlights with LED accents.

Mansory Cyrus – the Carbon Fibre DB9 at Frankfurt

Thu, 17 Sep 2009

The Mansory Cyrus - a Carbon Fibre clad DB9 But then you see it in the flesh. And it may not really look like a DB9 at first glance, but something inside says ‘Yes, please’ to Mansory’s carbon-fibre fest that is the Cyrus. Despite ourselves.

London black cabs to go 100% green by 2018

Mon, 20 Jan 2014

The Mayor of London, Boris Johnson, announced plans this week that will require all new London taxis to be zero-emission capable from 1 January 2018. The Mayor was speaking at Transport for London's 'New Taxis for London', an event where he met five manufacturers currently developing vehicles designed to meet the new requirements. Boris Johnson has previously pledged to make the capital an Ultra Low Emission Zone by 2020, although some have argued that it needs to come sooner than that.