Find or Sell any Parts for Your Vehicle in USA

Genuine Nissan Battery Tray 24428-jy00a on 2040-parts.com

US $50.58
Location:

Condition:New: A brand-new, unused, unopened, undamaged item in its original packaging (where packaging is applicable). Packaging should be the same as what is found in a retail store, unless the item was packaged by the manufacturer in non-retail packaging, such as an unprinted box or plastic bag. See the seller's listing for full details. See all condition definitions Brand:Nissan SKU:24428-JY00A Manufacturer Part Number:24428-JY00A Product Name:Genuine Nissan Battery Tray 24428-JY00A Genuine OEM:Yes Manufacturer Warranty:1 Year Fitment Type:Direct Replacement Make:Nissan Model:Rogue Year:2015 2016 2017 2018 2019 2020 Parts Included:ONLY PART REFERENCE #5 ON THE DIAGRAM IS INCLUDED

GTA Spano Supercar revealed in Valencia

Fri, 01 May 2009

The GTA Spano - a new Spanish Supercar revealed in Valencia [ad#ad-1] You’re right. This is not the best time to be producing a new supercar. But it’s a trifle difficult when you’ve been working on your new project for a while, all ready to go and the economy drops through a big black hole.

New Kia Flagship Showroom in West London

Mon, 10 Dec 2012

With Kia sales growing strongly in the UK, Kia are building a new flagship showroom in West London next to the A4 and M4. Just like sister car maker Hyundai, Kia’s offerings are becoming more credible with every new model and in a clear sign of the ever-rising confidence from the Koreans, Kia is planning a big new flagship showroom in West London. The new Kia showroom – which will sit alongside the A4 and M4 in Brentford, key car showroom territory – will consist of four floors, a curved facade with a ‘floating’ upper showroom with multi-level parking for visitors, and extend to a rather large 41,237 sq ft.

Detroit Electric delays SP:01 EV

Mon, 03 Jun 2013

Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.