Intake Gaskets for Sale
- 059130519b fuel injector o-ring for audi a4 - a8 q5 vw touareg genuine part new(US $23.00)
- Genuine gm throttle body gasket 12632900(US $12.97)
- Rolls royce silver spirit 1980-1986 fuel feed pipe o-ring seals ud11425 qty: 5(US $12.45)
- Fel-pro hs 26157 pt-1 head gasket set(US $99.00)
- Fel-pro 260-3192 engine gasket set(US $429.00)
- Fuel filter housing seal kit dorman 904-535(US $25.00)
Mercedes and McLaren – the end of the road
Sat, 05 Dec 2009The last SLR Stirling Moss ends the McLaren Mercedes relationship Times they are a changin’ for Mercedes & McLaren. The very last Mercedes McLaren SLR – The McLaren SLR Stirling Moss – has now rolled out of production at McLaren in Woking and both Mercedes and McLaren are going their seperate ways. McLaren is working to bring the new McLaren MP4-12C to market by 2011 as a replacement for the SLR, and Mercedes has already launched their replacement – the Mercedes SLS AMG Gulllwing – although it will be a few more months before cars hit the road.
Suzuki SX4 goes green for 2010
Mon, 24 Aug 2009The Suzuki SX4 gets some tweaks and extra eco-credentials for 2010 Actually, the little Suzuki is not a bad car at all. It drives well and is pretty well built, even if it could do with a bit more power. Well it gets that – just – in this revised version, together with some tweaks to make it more eco-friendly.
Nissan to open new Global Headquarters Gallery
Thu, 06 Aug 2009Nissan, which opened its new global headquarters in Yokohama, Japan, last weekend (coinciding with the unveiling of the automaker's new electrically-propelled Leaf), will open a new gallery dedicated to its products on August 8th. Just as German automakers BMW and Porsche have shrines dedicated to their respective brands, Nissan's new gallery will feature exhibits of its current products, classic models and cars from its racing heritage. The new gallery - which boasts an area four times larger than the previous Nissan gallery in the company's former headquarters in Higashi Ginza - occupies 4000m2 of space on the first floor of the new building.