Genuine Smart Car 451 Energy Absorbing Mount Left Or Right Side With Warranty on 2040-parts.com
Winter Springs, Florida, US
Genuine Smart Car 451 Energy Absorbing Mount
- Brand New Genuine OEM Part
- Part comes with one year warranty
- Smart Car part # 4518850137
- Note: If unsure please email us your VIN#
Bumpers for Sale
- 2002-2008 dodge ram 1500 r2500 r3500 mega cab rear step bumper black face bar(US $201.08)
- 97-03 chevy malibu 99-05 grand am driver left front bumper impact bar bracket(US $30.90)
- 05-06 nissan altima raw black primered front bumper cover set replacement(US $93.75)
- Toyota hiace 1992 front bumper assembly [0910100](US $489.00)
- 80pcs x plastic rivet fastener bumper mud flaps push clips for nissan infiniti(US $7.59)
- 02-04 nissan altima front bumper fascia cover primed blk plastic capa certified(US $125.79)
Police get tough with Ariel Atom supercar
Wed, 04 Jun 2014ANYONE with a taste for speed might fear the sight of flashing blue lights in their mirrors, but nothing could be more frightening than this! British supercar maker Ariel has created this police-specification version of its new Atom 3.5 in order to support the Avon and Somerset Constabulary’s Safer Rider campaign. The Atom PL1 has the same 350bhp supercharged 2.0-litre Honda engine, sequential gearbox and spectacular performance as the regular car – with a 0-60mph time of 2.5 seconds it can match most superbikes – but with the addition of Avon and Somerset Constabulary livery, aerodynamic pursuit lights and safety equipment.
New Mitsubishi Mirage to replace Colt in 2013
Sun, 01 Apr 2012Mitsubishi Mirage The new Mitsubishi Mirage – a ‘Global Compact Car – has gone on sale in Thailand, is being built in Thailand and will replace the Mitsubishi Colt in Europe in 2013. The new Mitsubishi Mirage is a budget five-door hatchback that Mitsubishi are aiming at emerging markets. But it’s not going to stop there.
General Motors spending $131 million to upgrade Corvette plant
Wed, 04 May 2011General Motors is spending $131 million on its Bowling Green, Ky., assembly plant to prepare it to build the next-generation Corvette. The plant will spend the money on manufacturing equipment, specialized tooling and plant updates, said Mark Reuss, GM's president of North America. The plant will add about 250 jobs, which will boost its workforce by about 50 percent, to about 750 workers.