Find or Sell any Parts for Your Vehicle in USA

Gmk404450065r Goodmark Floor Pan Passenger Side Edp Coated Steel Fits Firewall T on 2040-parts.com

US $199.73
Location:

64105, US

64105, US
Returns Accepted:Returns Accepted Refund will be given as:Money Back Item must be returned within:30 Days Return shipping will be paid by:Buyer Restocking Fee:20% Interchange Part Number:4044-500-65R Surface Finish:EDP Coated Steel Placement on Vehicle:Right Other Part Number:CVI1043BR Manufacturer Part Number:GMK404450065R Position:Passenger Side Part Brand:Goodmark Warranty:Yes Questions:Call 1-800-490-3436

Part Description:

Core: Floor Pan

Position On Vehicle: Passenger Side

Finish/Material Information: EDP Coated Steel

Notes: Fits Firewall To Rear Foot well

Manufacturer: Goodmark

Goodmark Part Number: GMK404450065R

Old Goodmark Part Number: 4044-500-65R

Other Part Number: CVI1043BR

Fitment:

1965-1970 Chevrolet Impala

Other for Sale

2013 Porsche 911 GT3 to go auto

Tue, 08 Feb 2011

2013 Porsche 911 GT3 to get PDK The storm clouds are gathering. Porsche purists are massing their ranks for an assault on Stuttgart. Civilisation as we know it is under threat.

Schumacher takes pole in Monaco – but starts sixth

Sat, 26 May 2012

Schumacher was quickest in Monaco qualifying Turn the clock back a day or two at the 2012 Monaco Grand Prix and all the clever money would have been on Lotus dominating proceedings. But 48 hours is a long time in a 2012 season of tyres that dictate performance seemingly based on which way the wind’s blowing. So instead of Lotus dominating proceedings we had Mercedes qualifying strongly, with Michael Schumacher taking pole and team mate Nico Rosberg in third.

GM sketches out order deadlines for 2012, 2013 Chevrolet Corvettes

Tue, 17 Jan 2012

We've already told you how General Motors plans the honor the 60th anniversary of the Chevrolet Corvette with a special trim package for the 2013 model, along with the fire-breathing 427 convertible. But GM has given Chevy dealers the heads-up on its production plans. In short: Buyers have less time than usual to place their orders.