Harley-davidson Aermacchi Handlebar U Bolt 45629-61pa New Old Stock Jp on 2040-parts.com
Colorado Springs, Colorado, United States
Brand:Harley Davidson
Part Type:handlebars
Manufacturer Part Number:45629-61PA
Handle Bars / Mirrors for Sale
RCA 'Future Car' design competition winner announcedFri, 08 Jun 2012Michal Vlcek, a first-year student in the Vehicle Design department at London's Royal College of Arts, has been announced by the organizers of the London Motorexpo as the winner of the competition to design an innovative electric-powered car. The competition, which was open exclusively to RCA students, asked for designs for the four person electric vehicle of 2032, using "the packaging advantages of an electric motor to move way from the formulaic styling of many modern-day passenger cars". Vlcek's high-quality artwork and lateral thinking proved to be instrumental in his success. Button wins in Barcelona – another Brawn 1-2Sun, 10 May 2009Button wins for Brawn GP in Barcelona - with Barrichello in second place [ad#ad-1] Brawn’s fairytale season continues, with Jenson Button taking the win in Barcelona, with team mate Rubens Barrichello in second place. Button lost first place to team mate Barrichello off the line but, after a safety car on the first lap, strategy genius Ross Brawn moved Button on to a two-stop strategy, which proved a master stroke as Button cruised in to an 11 second lead by mid-point, and ended the day 13 seconds ahead of Barrichello at the finish. Ferrari had a better day than they’ve had of late, and Massa looked good for a strong finish, but an error at his last pit-stop left him short of fuel, and he had to back off and let Vettel in the Red Bull through in the dying laps of the race to have a chance of making it to the end. London underpass to hold flood waterMon, 10 Feb 2014A PEDESTRIAN UNDERPASS is to be turned into an emergency pond to hold hundreds of thousands of litres of floodwater threatening homes and businesses in south London. The Purley Cross underpass will be used to hold water pumped from around 400 under-threat buildings in parts of Kenley and Purley and to stop a water treatment works which supplies tens of thousands of homes from flooding, Croydon Council said. The authority said the plan to use the underground footway to hold around 600,000 litres of water from tonight was approved after its "primary" pond at Purley Depot overflowed last night. 2040Parts.com © 2012-2024. All Rights Reserved. Designated trademarks and brands are the property of their respective owners. Use of this Web site constitutes acceptance of the 2040Parts User Agreement and Privacy Policy. 0.039 s, 11774 u |