Harley Flht / Fltr / Flhx 92-13 Kuryakyn Button Fuel Door Latch *new* on 2040-parts.com
Dallas, Texas, US
Accessories for Sale
- Progrip 724 dual density grip 7/8 inch handlebars - black(US $14.99)
- 73 yamaha tx750 seat hinge latch brackets , 1973 tx 750(US $25.00)
- Round horn cover chrome for yamaha v-star 650 98-06 v-star 1100 99-06 00 01 02 (US $18.49)
- Nos genuine harley davidson bar & shield transmission end cover #34785-02(US $18.95)
- Harley-davidson road king oval air cleaner cover with live to ride coverplate(US $25.00)
- Luggage electrix connector (US $28.95)
McLaren P1 concept
Tue, 18 Sep 2012The McLaren P1 concept – the company's flagship hypercar model – will make its world debut at the Paris motor show next week ahead of the production model some time next year. These first images reveal an exterior that's more expressive in its surfacing and graphics than the existing MP4-12C, with a particular motif made of McLaren's 'tick' logo through the DRG. Its bodywork also appears to be layered over the underlying carbon structure that appears around the nose, rear and door panel, which hint at the diagonal bar that ran through the F1's doors, although here it dives downwards rather than creating a wedge.
Toyota Prius Alpha, Prius Plug-in & Prius Concept at Detroit
Fri, 24 Dec 2010Toyota Prius MPV (Toyota Prius Alpha) Teaser Toyota has been threatening to build more versions of the Prius for a very long time. Almost as long as there’s been a Prius, in fact. Until recently we thought that all Toyota Hybrids would be badged ‘Prius’.
Peugeot Citroen idles Slovak factory over falling orders
Thu, 20 Oct 2011PSA to halt production of 207 & C3 Picasso in Slovakia The news that Peugeot Citroen (PSA) is to suspend production at its factory in Trnava, Western Slovakia, as orders for cars fall away, is another sign of the impending gloom in the Euro zone car industry. PSA has revealed that the Trnava factory – which produces the Peugeot 207 and Citroen C3 Picasso – will be shut from October 28th to November 18th (a period which does include two bank holidays) as orders start to fall away and production exceeds demand. But this announcement seems to be the tip of the iceberg for PSA’s factory closures.