Fuel Filters for Sale
- Earls plumbing 230104erlp fuel filter(US $46.06)
- Bosch 71054 fuel filter(US $16.13)
- Bosch 71028 fuel filter(US $22.52)
- Alfa romeo spider in-tank fuel pump braket & clamp(US $34.88)
- F250sd 2001 fuel vapor canister 52108(US $188.50)
- Fleetguard mk12381 maintenance kit lf691a ff5319 ff5207 filters oil fuel(US $20.00)
Toyota Hydrogen Fuel Cell breakthrough to be announced at Frankfurt Motor Show
Mon, 02 Sep 2013Toyota Hydrogen Fuel Cell breakthrough to be announced at Frankfurt Motor Show Regardless of whether you think the electric car is potentially a planet saviour or not, the idea of powering cars with hydrogen is a powerful one; the holy grail of automotive powertrains. Technically, ICE cars can be built to run using hydrogen (and a retro-fit allowing that to be achieved economically would be a huge breakthrough) but car makers are heading down the road of electric cars being powered by a hydrogen fuel cell at the moment. In Toyota’s case, that means a setup similar to their hybrid cars, with a hydrogen fuel cell replacing the petrol engine.
Top Gear USA to show on BBC Three +video
Sun, 09 Oct 2011Top Gear USA arrives on BBC Three next week. Top Gear is something of a phenomenon. From a rather stuffy show fronted by the likes of William Woollard and Angela Rippon, it has morphed in to the world’s most popular car programme bar none.
Nissan to open new Global Headquarters Gallery
Thu, 06 Aug 2009Nissan, which opened its new global headquarters in Yokohama, Japan, last weekend (coinciding with the unveiling of the automaker's new electrically-propelled Leaf), will open a new gallery dedicated to its products on August 8th. Just as German automakers BMW and Porsche have shrines dedicated to their respective brands, Nissan's new gallery will feature exhibits of its current products, classic models and cars from its racing heritage. The new gallery - which boasts an area four times larger than the previous Nissan gallery in the company's former headquarters in Higashi Ginza - occupies 4000m2 of space on the first floor of the new building.