Head Gasket Kit 2003-2004 Cadillac Cts on 2040-parts.com
Milwaukee, Wisconsin, United States
Full Set Gaskets for Sale
- Victor 95-3398vr engine kit set(US $80.65)
- Dnj engine components fgs3025 full set(US $118.26)
- Dnj engine components fgs1010 full set(US $124.42)
- Dnj engine components fgs7010 full set(US $172.81)
- Dnj engine components fgs5000 full set(US $81.30)
- Dnj engine components fgs9065 full set(US $223.85)
Volvo XC90 loses two-tone body, adds more options for 2013
Fri, 06 Jan 2012Volvo refreshed its XC90 SUV for the 2013 model year. The Swedish automaker says it's the most significant update since the vehicle's debut a decade ago. At the top of the list--for us anyway--is the deletion of the lower body cladding.
Official: Aston Martin gets its hands on Mercedes AMG engines & Electronic Architecture
Thu, 25 Jul 2013Aston Martin & AMG confirm they’re getting in bed together Back in December we reported that Aston Martin had new investment from Investindustrial and wondered if that would mean – thanks to an existing relationship between Investindustrial and AMG – if we’d see Aston Martin finally getting access to AMG’s engines and platforms. By May, things had moved on and it was clear that Aston Martin and AMG were in talks for Aston Martin to get access to their engines for the next generation of AML’s cars. Now those talks have borne fruit and AMG and AML have signed a letter of intent for Aston Martin to “access significant Mercedes-AMG GmbH and Mercedes-Benz Cars’ resources, allowing the development of bespoke V8 powertrains and the use of certain components of electric/electronic (e/e) architecture.” Interestingly, there’s no talk of V12 engines – which could mean Aston Martin are going to move from the current Ford V12 for the DB9 and Vanquish to a powerful V8 from AMG – and nor is there talk of sharing platforms.
Detroit Electric delays SP:01 EV
Mon, 03 Jun 2013Detroit Electric will delay the SP:01 EV roadster for at least a month, according to a company executive who talked to the Detroit News. The company still hasn’t finalized a manufacturing location in Wayne County. Production was scheduled to start in August, now it’s slated for September.