Hvac Blower Motor Resistor Dorman 973-027 on 2040-parts.com
West Palm Beach, Florida, United States
Blower Motors for Sale
- 2003 04 05 saab 9-3 climate control blower motor resistor oem tested ok $229(US $24.95)
- Hvac blower motor global 2311716(US $56.89)
- Hvac blower motor resistor standard ru-294 fits 04-06 toyota camry 2.4l-l4(US $48.64)
- Hvac blower motor resistor standard ru-370 fits 02-07 mitsubishi lancer 2.0l-l4(US $85.82)
- Standard motor products ru504 blower motor resistor(US $39.12)
- Standard motor products ru369 blower motor resistor(US $29.09)
Japan's Toyota Prius Cup showcases hybrid car
Mon, 02 Feb 2009With steely stares and clenched hands, the drivers peer from their crash helmets as the race marshal slowly raises the green flag. Then the flag drops. And they're off!
Top Gear Tonight: Spitfire Bentley, V12 BMW Brutus, Track Day Cars & SIARPC is Alex James
Sun, 04 Mar 2012Jeremy goes vintage Supecar blatting Top Gear Series 18 Episode 6 tonight sees a vintage BMW and Bentley on track, Track Day Cars and Alex James from Blur is SIARPC. Doesn’t time fly when you’re having fun? Series 18 of Top Gear is almost over as tonight’s episode – episode 6 – is the penultimate of the latest series.
Call for reform over road repair funding
Fri, 06 Jun 2014FUNDING patterns mean most road maintenance is being carried out in "less-efficient, cold and wet" times, a report from a Government spending watchdog has said. The current pattern of funding, combined with the need to spend money within the financial year, means that most maintenance work goes on between September and March, said the report from the National Audit Office (NAO). It went on: "Although this is less disruptive for road users, it is less efficient than carrying out the work at other times of year because materials can be more difficult to handle in cold and wet conditions, and daylight hours are shorter." The report went on: "As a result of the additional funding for emergency repairs, which is made available at the end of the financial year, almost all highways authorities need extra capacity from the market at the same time, which makes it less likely that they will get value for money." The NAO report said there was a "lack of predictability" over road spending adding that historically, local highway authorities spent more revenue on maintenance, but were now carrying out fewer routine activities such as clearing gullies which are essential to preventing water seeping into roads' sub-structure.